WELL · 42-447-33799 · DISTRICT 7

Bailey #2

Plugged

Throckmorton County · Throckmorton County Regular field  · Vertical

Bailey #2 (API 42-447-33799) is a plugged well in Throckmorton County, plugged March 17, 1997, last operated by M. & K. Development CO..

The RRC has issued one drilling permit (amended once), issued September 16, 1983, permitted to 1,400 ft.

Its lease has reported 71 barrels of oil and 50 mcf of gas since January 1993, last reporting in August 2003. The lease carries 5 wells, so these are lease totals, not this well alone.

Operator of record

M. & K. Development Co.

Lolita, TX · P-5 Y, filed Mar 7, 1997 · 4 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleM. & K. Development Co.
Production reportsM. & K. Development Co.through Feb 1997
Latest permitM. & K. Development Co.Sep 16, 1983
1,400
total depth, ft
2
permits on file
Sep 16, 1983
last permit issued
Oct 13, 1983
completed
71
cumulative oil, bbl
50
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 13, 1983
Shut in
—
Plugged
Mar 17, 1997

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bailey O-8-24037Throckmorton County RegularM. & K. Development Co.57150Jan 1993 – Aug 2003

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1M. & K. Development Co.Jan 1993 → Sep 1996

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
212821-98DrillM. & K. Development Co.Oct 16, 1986Sep 16, 1983—1,400
212821-99DrillReynolds, RichardAug 29, 1983Sep 16, 1983Oct 1, 19831,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-24037————

Perforations

Perforated and open-hole intervals.

FromToType
366373Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.56486.75143 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 31, 1986Jul 9, 1986—
00Dec 1, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44733799, documented in the API reference.