WELL · 42-447-33890 · DISTRICT 7

Swenson Ranch #5154

Plugged

Throckmorton County · Tom (Caddo 4765) field  · Vertical

Swenson Ranch #5154 (API 42-447-33890) is a plugged well in Throckmorton County, plugged September 22, 1993, last operated by S.B. Street Operating Inc..

The RRC has issued one drilling permit, issued November 7, 1983, permitted to 5,200 ft.

It was permitted by Benson Mineral Group, Inc. and has since transferred to S.B. Street Operating Inc. on the wellbore schedule.

Completion filings report 5 formation tops, including Palo Pinto, Strawn, Caddo, Bend.

Its lease has reported 98.8K barrels of oil and 495K mcf of gas since January 1993, last reporting in July 2026. The lease carries 6 wells, so these are lease totals, not this well alone.

Operator of record

S.B. Street Operating Inc.

Permitted by Benson Mineral Group, Inc.; the EWA schedule now lists a different operator.

Graham, TX · P-5 Y, filed Dec 4, 2025 · 274 permits on file · (325) 226-1585

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleS.B. Street Operating Inc.
Production reportsRomac Oil Company, Inc.through Aug 2025
Latest permitBenson Mineral Group, Inc.Nov 7, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,200
total depth, ft
1
permits on file
Nov 7, 1983
last permit issued
Feb 2, 1984
completed
98.8K
cumulative oil, bbl
495K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 2, 1984
Shut in
—
Plugged
Sep 22, 1993

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Swenson Ranch O-8-19119Tom (Caddo 4765)S.B. Street Operating, Inc.698.8K495KJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

0200400202420252026

Oil, barrels lease total

Last 12 months 3 · prior 12 0

051015202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Benson Mineral Group, Inc.Jan 1993 → Apr 1996
  2. 2Romac Oil Company, Inc.May 1996 → Aug 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
220236-99DrillBenson Mineral Group, Inc.Feb 10, 1984Nov 7, 1983Nov 23, 19835,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-19119————

Formation tops

As filed on W-2/G-1. Subsea from 1,559 ft elevation.Download CSV →

FormationMD ftSubsea
Palo Pinto3,195-1,636
StrawnSTRAWN SAND4,165-2,606
CaddoCADDO LIME4,792-3,233
BendBEND CONGLOMERATE5,178-3,619
Mississippian5,228-3,669

Perforations

Perforated and open-hole intervals.

FromToType
4,7924,798Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512012.25100 S
4.55,2447.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 3, 1984Feb 13, 1984—
00Mar 27, 1984Feb 13, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Apr 1993
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000067690H-1 InjectionPlugged Oct 14, 19935004004,792–4,798

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119921993

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44733890, documented in the API reference.