WELL · 42-447-34492 · DISTRICT 7

Hilltex River Ranch 233 #1 #5

Plugged

Throckmorton County · Throckmorton County Regular field  · Vertical

Hilltex River Ranch 233 #1 #5 (API 42-447-34492) is a plugged well in Throckmorton County, plugged February 17, 1992, last operated by Beehive Operating LLC.

The RRC has issued 2 drilling permits (amended once) between 1985 and 1986, permitted to 4,900 ft.

It was permitted by Campbell, T. K. and has since transferred to Beehive Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Caddo, Mississippian, Ellenburger.

Its lease has reported 3.36K barrels of oil and 79 mcf of gas since January 1993, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

Beehive Operating LLC

Permitted by Campbell, T. K.; the EWA schedule now lists a different operator.

Graham, TX · P-5 Y, filed May 4, 2026 · (877) 682-1308

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBeehive Operating LLC
Production reportsHilltex Operating Company, LLCthrough May 2018
Latest permitCampbell, T. K.Sep 30, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,900
total depth, ft
3
permits on file
Sep 30, 1986
last permit issued
Jun 23, 1988
completed
3.36K
cumulative oil, bbl
79
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 23, 1988
Shut in
—
Plugged
Feb 17, 1992

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hilltex River Ranch 233 #1 O-8-24221Throckmorton County RegularBeehive Operating, LLC33.36K79Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Campbell, T. K.Jul 1993 → Oct 1999
  2. 2Hilltex Operating Company, LLCSep 2006 → May 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
321032-98RecompletionCampbell, T. K.Aug 3, 1987Sep 30, 1986—4,202
321032-99RecompletionCampbell, T. K.Sep 24, 1986Sep 30, 1986—4,900
287680-99DrillCampbell, T. K.Jun 5, 1986Oct 17, 1985Jan 5, 19864,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-24221————

Formation tops

As filed on W-2/G-1. Subsea from 1,258 ft elevation.Download CSV →

FormationMD ftSubsea
Caddo3,921-2,663
MississippianMISSISSIPPI4,521-3,263
Ellenburger4,823-3,565

Perforations

Perforated and open-hole intervals.

FromToType
4,2024,208Perforated
4,2204,226Perforated
4,2304,238Perforated
4,5284,532Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62517911125 S
5.54,686—405 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 28, 1989Jul 3, 1989—
00Jul 22, 1989——
00Jul 7, 1986May 19, 1986Yes
00Jul 3, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Apr 1992
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000069165W-14 DisposalPlugged Mar 2, 19921,0001,5004,202–4,238

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119911992

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44734492, documented in the API reference.