WELL · 42-447-34515 · DISTRICT 7
Harrington #1
Throckmorton County · A. Baker (Miss.) field · Vertical
Harrington #1 (API 42-447-34515) is a plugged well in Throckmorton County, plugged April 26, 1988, last operated by Buffum & Baker Inc..
The RRC has issued one drilling permit, issued December 3, 1985, permitted to 4,900 ft.
Completion filings report 2 formation tops, including Caddo, Mississippian.
Operator of record
Wichita Falls, TX · P-5 Y, filed Jul 8, 1992 · 27 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Buffum & Baker Inc. |
| Production reports | none |
| Latest permit | Buffum & Baker, Inc.Dec 3, 1985 |
- 4,900
- total depth, ft
- 1
- permits on file
- Dec 3, 1985
- last permit issued
- Dec 15, 1985
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 15, 1985
- Shut in
- —
- Plugged
- Apr 26, 1988
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 291558-99 | Drill | Buffum & Baker, Inc. | Nov 18, 1985 | Dec 3, 1985 | — | 4,900 |
Formation tops
As filed on W-2/G-1. Subsea from 1,346 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Caddo | 4,180 | -2,834 |
| Mississippian | 4,560 | -3,214 |
| Mississippian | 4,586 | -3,240 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,358 | 4,361 | Perforated |
| 4,582 | 4,594 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 101 | — | — |
| 5.5 | 4,582 | — | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 20, 1987 | Jan 12, 1987 | — |
| 00 | Feb 13, 1987 | — | — |
| 00 | Apr 1, 1986 | Mar 3, 1986 | Yes |
| 00 | Mar 19, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-447-34515 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-447-34515 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/44734515, documented in the API reference.