WELL · 42-447-34643 · DISTRICT 7

Hannis West #1

Plugged

Throckmorton County · Throckmorton County Regular field  · Vertical

Hannis West #1 (API 42-447-34643) is a plugged well in Throckmorton County, plugged August 25, 2003, last operated by Spence Energy Company.

The RRC has issued one drilling permit, issued September 8, 1986, permitted to 5,500 ft.

It was permitted by Allison Oil Account and has since transferred to Spence Energy Company on the wellbore schedule.

Completion filings report 2 formation tops, including Caddo, Mississippian.

Its lease has reported 2.2K barrels of oil and 35 mcf of gas since January 1993, last reporting in October 2003.

Operator of record

Spence Energy Company

Permitted by Allison Oil Account; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed May 4, 2026 · 96 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSpence Energy Company
Production reportsSpence Energy Companythrough Mar 1999
Latest permitAllison Oil AccountSep 8, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,500
total depth, ft
1
permits on file
Sep 8, 1986
last permit issued
Jun 1, 1999
completed
2.2K
cumulative oil, bbl
35
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2003

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 1, 1999
Shut in
—
Plugged
Aug 25, 2003

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hannis West O-8-24012Throckmorton County RegularSpence Energy Company12.2K35Jan 1993 – Oct 2003

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Allison Oil AccountJan 1993 → Nov 1994
  2. 2Sunday CorporationJan 1995 → Oct 1998
  3. 3Spence Energy CompanyNov 1998 → Mar 1999

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
320170-99DrillAllison Oil AccountSep 4, 1986Sep 8, 1986—5,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-24012————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
CaddoCADDO LIME4,460
MississippianMISSISSIPPI4,798

Perforations

Perforated and open-hole intervals.

FromToType
2,4002,440Perforated
4,8004,831Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512512.2595 S
4.54,8007.875150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 20, 2002Aug 16, 2001—
00Aug 29, 2001Jun 4, 2001—
00Nov 26, 1986Oct 31, 1986Yes
00Nov 7, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
1.5K
bbl, all reported
Aug 2003
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000089070H-1 InjectionPlugged Oct 9, 20031,0007502,300–2,500

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 612(-100%)

05010015020022003

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44734643, documented in the API reference.