WELL · 42-447-34827 · DISTRICT 7
Mitchell #1
Throckmorton County · Tri Mitchell field · Vertical
Mitchell #1 (API 42-447-34827) is a plugged well in Throckmorton County, plugged March 27, 1997, last operated by East Texas Pipe.
The RRC has issued one drilling permit, issued December 22, 1987, permitted to 5,200 ft.
It was permitted by Tiara Resources, Inc. and has since transferred to East Texas Pipe on the wellbore schedule.
Completion filings report 5 formation tops, including Smithwick, Caddo, Marble Falls, Barnett.
Its lease has reported 299 barrels of oil and 7.26K mcf of gas since January 1993, last reporting in November 1997. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Tiara Resources, Inc.; the EWA schedule now lists a different operator.
Strawn, TX · P-5 Y, filed Mar 6, 1999
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | East Texas Pipe |
| Production reports | Tiara Resources, Inc.through Jan 1996 |
| Latest permit | Tiara Resources, Inc.Dec 22, 1987 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,200
- total depth, ft
- 1
- permits on file
- Dec 22, 1987
- last permit issued
- Apr 6, 1988
- completed
- 299
- cumulative oil, bbl
- 7.26K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 1997
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 6, 1988
- Shut in
- —
- Plugged
- Mar 27, 1997
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mitchell O-8-24859 | Tri Mitchell | East Texas Pipe | 2 | 299 | 7.26K | Jan 1993 – Nov 1997 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Tiara Resources, Inc.Jan 1993 → Oct 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 340434-99 | Drill | Tiara Resources, Inc. | Dec 18, 1987 | Dec 22, 1987 | — | 5,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-24859 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,459 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| SmithwickSMITHWICK SHALE | 4,448 | -2,989 |
| Caddo | 4,481 | -3,022 |
| Marble FallsMARBLE FALLS CONG. | 4,926 | -3,467 |
| BarnettBARNETT SHALE | 4,990 | -3,531 |
| ChesterCHESTER (MISS) | 5,024 | -3,565 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,024 | 5,028 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 224 | 12.25 | 125 S |
| 4.5 | 5,030 | 7.625 | 230 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 12, 1988 | Apr 21, 1988 | — |
| 00 | May 6, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-447-34827 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-447-34827 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/44734827, documented in the API reference.