WELL · 42-447-35113 · DISTRICT 7

Hendrick T. G. Est. 12-A #5

Plugged

Throckmorton County · Tammy (Flippen) field  · Vertical

Hendrick T. G. Est. 12-A #5 (API 42-447-35113) is a plugged well in Throckmorton County, plugged September 27, 2024, last operated by G & F Oil Inc..

The RRC has issued one drilling permit, issued August 10, 1990, permitted to 1,300 ft.

It was permitted by Glahn Resources, Inc. and has since transferred to G & F Oil Inc. on the wellbore schedule.

Completion filings report one formation top, including Flippen Sand.

Its lease has reported 44.9K barrels of oil and 19 mcf of gas since January 1993, last reporting in July 2026. The lease carries 8 wells, so these are lease totals, not this well alone.

Operator of record

G & F Oil Inc.

Permitted by Glahn Resources, Inc.; the EWA schedule now lists a different operator.

Aledo, TX · P-5 Y, filed Jul 4, 2026 · 150 permits on file · (817) 939-8851

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleG & F Oil Inc.
Production reportsG & F Oil, Inc.through Nov 2021
Latest permitGlahn Resources, Inc.Aug 10, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,300
total depth, ft
1
permits on file
Aug 10, 1990
last permit issued
Sep 10, 1990
completed
44.9K
cumulative oil, bbl
19
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 10, 1990
Shut in
—
Plugged
Sep 27, 2024

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hendrick, T. G. Est. 12-A O-8-25658Tammy (Flippen)G & F Oil, Inc.844.9K19Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Glahn Resources, Inc.Jan 1993 → Mar 2015
  2. 2G & F Oil, Inc.Apr 2004 → Nov 2021
  3. 3Bootstrap Exploration, Inc.Apr 2015 → Oct 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
376432-99DrillGlahn Resources, Inc.Aug 10, 1990Aug 10, 1990Aug 26, 19901,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-25658————

Formation tops

As filed on W-2/G-1. Subsea from 1,330 ft elevation.Download CSV →

FormationMD ftSubsea
Flippen Sand1,170160

Perforations

Perforated and open-hole intervals.

FromToType
1,1701,174Perforated
1,1851,188Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,2447.875280 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 7, 1992Jun 8, 1992Yes
00Jul 16, 1992——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
863K
bbl, all reported
Aug 2024
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000077507H-1 InjectionPlugged Oct 16, 20242504001,170–1,188

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120232024

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44735113, documented in the API reference.