WELL · 42-447-35445 · DISTRICT 7
Lambshead E-5 #3
Throckmorton County · Open a & Lazy V (Miss.) field · Vertical
Lambshead E-5 #3 (API 42-447-35445) is a plugged well in Throckmorton County, plugged December 11, 1996, last operated by Throckmorton Oil Inc..
The RRC has issued one drilling permit (amended once), issued December 28, 1993, permitted to 5,000 ft.
Completion filings report one formation top, including Mississippian.
Its 2 leases have reported 2.97K barrels of oil and 36.1K mcf of gas since May 1994, last reporting in March 1997. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Throckmorton, TX · P-5 Y, filed Dec 3, 2004 · 223 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Throckmorton Oil Inc. |
| Production reports | Throckmorton Oil, Inc.through Jun 1996 |
| Latest permit | Throckmorton Oil, Inc.Dec 28, 1993 |
- 5,000
- total depth, ft
- 2
- permits on file
- Dec 28, 1993
- last permit issued
- May 3, 1994
- completed
- 2.97K
- cumulative oil, bbl
- 36.1K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 1994 THROUGH Mar 1997
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 3, 1994
- Shut in
- —
- Plugged
- Dec 11, 1996
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Lambshead E-5 O-8-27496 | Open a & Lazy V (Miss.) | Throckmorton Oil, Inc. | 1 | 2.97K | 22.5K | Dec 1994 – Mar 1997 |
| Lambshead E-5 G-8-149632 | Open a & Lazy V (Miss.) | Throckmorton Oil, Inc. | 1 | 0 | 13.6K | May 1994 – Dec 1994 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Throckmorton Oil, Inc.May 1994 → Jun 1996
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 419682-98 | Drill | Throckmorton Oil, Inc. | May 27, 1994 | Dec 28, 1993 | Feb 10, 1994 | 5,000 |
| 419682-99 | Drill | Throckmorton Oil, Inc. | Dec 27, 1993 | Dec 28, 1993 | — | 5,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-149632 | — | — | — | — |
| — | — O-8-27496 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,728 | 4,740 | Perforated |
| 4,745 | 4,747 | Perforated |
| 4,753 | 4,755 | Perforated |
| 4,760 | 4,762 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 601 | 12.25 | 359 S |
| 5.5 | 4,956 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 6, 1995 | Mar 1, 1995 | — |
| 00 | Mar 20, 1995 | — | — |
| 00 | Jun 28, 1994 | May 25, 1994 | Yes |
| 00 | Jun 24, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-447-35445 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-447-35445 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/44735445, documented in the API reference.