WELL · 42-447-35609 · DISTRICT 7

Lambshead E-11 #2S

Plugged

Throckmorton County · Throckmorton County Regular field  · Vertical

Lambshead E-11 #2S (API 42-447-35609) is a plugged well in Throckmorton County, plugged December 12, 2017, last operated by Avad Operating LLC.

The RRC has issued one drilling permit (amended once), issued March 1, 1996, permitted to 2,000 ft.

It was permitted by L.C.S. Production Company and has since transferred to Avad Operating LLC on the wellbore schedule.

Completion filings report one formation top, including Bluff Creek.

Its lease has reported 127 barrels of oil since March 1996, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

Avad Operating LLC

Permitted by L.C.S. Production Company; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Inactive, filed Sep 29, 2023 · 19 permits on file · (214) 484-4337

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAvad Operating LLC
Production reportsL.C.S. Production Companythrough Jun 1997
Latest permitL.C.S. Production CompanyMar 1, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,000
total depth, ft
2
permits on file
Mar 1, 1996
last permit issued
Mar 11, 1996
completed
127
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1996 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 11, 1996
Shut in
—
Plugged
Dec 12, 2017

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lambshead E-11 O-8-27801Throckmorton County RegularAvad Operating, LLC31270Mar 1996 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1L.C.S. Production CompanyMar 1996 → Jun 1997

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
445399-98DrillL.C.S. Production CompanyMar 12, 1996Mar 1, 1996Mar 4, 19962,000
445399-99DrillL.C.S. Production CompanyMar 1, 1996Mar 1, 1996—2,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-27801————

Formation tops

As filed on W-2/G-1. Subsea from 1,235 ft elevation.Download CSV →

FormationMD ftSubsea
Bluff Creek710525

Perforations

Perforated and open-hole intervals.

FromToType
901911Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
7.6251001180 S
4.59486.75140 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 22, 1996Mar 18, 1996Yes
00Mar 28, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44735609, documented in the API reference.