WELL · 42-447-36093 · DISTRICT 7
King Max #1
Throckmorton County · Throckmorton County Regular field · Vertical
King Max #1 (API 42-447-36093) is a plugged well in Throckmorton County, plugged September 13, 2019, last operated by Powell-Mccarroll Partnership.
The RRC has issued one drilling permit, issued April 2, 2003, permitted to 4,150 ft.
It was permitted by Bullitt Oil and has since transferred to Powell-Mccarroll Partnership on the wellbore schedule.
Completion filings report 2 formation tops, including Manning-Harrington (Strawn), Manning-Harrington(Strawn).
Its lease has reported 6.73K barrels of oil and 6.88K mcf of gas since April 2003, last reporting in July 2026.
Operator of record
Permitted by Bullitt Oil; the EWA schedule now lists a different operator.
Sachse, TX · P-5 Y, filed May 29, 2025 · 10 permits on file · (972) 463-0827
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Powell-McCarroll Partnership |
| Production reports | Powell-McCarroll Partnershipthrough Jul 2013 |
| Latest permit | Bullitt OilApr 2, 2003 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,150
- total depth, ft
- 1
- permits on file
- Apr 2, 2003
- last permit issued
- Apr 17, 2003
- completed
- 6.73K
- cumulative oil, bbl
- 6.88K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2003 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 17, 2003
- Shut in
- —
- Plugged
- Sep 13, 2019
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| King, Max O-8-29257 | Throckmorton County Regular | Powell-McCarroll Partnership | 1 | 6.73K | 6.88K | Apr 2003 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Bullitt OilApr 2003 → Jan 2011
- 2Powell-McCarroll PartnershipFeb 2011 → Jul 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 530232-99 | Drill | Bullitt Oil | Apr 2, 2003 | Apr 2, 2003 | Apr 13, 2003 | 4,150 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-29257 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,456 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Manning-Harrington (Strawn) | 4,034 | -2,578 |
| Manning-Harrington(strawn) | 4,034 | -2,578 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,034 | 4,036 | Perforated |
| 4,035 | 4,041 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 130 | 12.25 | 80 S |
| 4.5 | 4,170 | 7.875 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 8, 2003 | Jun 30, 2003 | — |
| 00 | Jul 30, 2003 | Jun 19, 2003 | Yes |
| 00 | Jul 10, 2003 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-447-36093 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-447-36093 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/44736093, documented in the API reference.