WELL · 42-447-36706 · DISTRICT 8
Tecumseh Ranch #1
Throckmorton County · Vertical
Tecumseh Ranch #1 (API 42-447-36706) is a former disposal or injection well in Throckmorton County, last operated by North Texas Oil & Gas, LLC; its UIC permit is no longer active.
The RRC has issued one drilling permit, issued December 28, 2016, permitted to 7,000 ft.
Operator of record
Edmond, OK · P-5 Y, filed Dec 4, 2025 · 53 permits on file · (877) 271-5887
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | North Texas Oil & Gas, LLCDec 28, 2016 |
- 7,000
- total depth, ft
- 1
- permits on file
- Dec 28, 2016
- last permit issued
- —
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 821192-99 | Drill | North Texas Oil & Gas, LLC | Dec 13, 2016 | Dec 28, 2016 | — | 7,000 |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-447-36706 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-447-36706 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- Jun 2020
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000115347 | W-14 Disposal | Canceled Jan 11, 2021 | 25,000 | 2,800 | 5,611–6,900 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/44736706, documented in the API reference.