WELL · 42-449-30214 · DISTRICT 6

Davis Pat H #1-SWD

Y

Titus County · Talco field · Injection  · Vertical

Davis Pat H #1-SWD (API 42-449-30214) is a well in Titus County operated by Arcadia Operating LLC, completed November 1, 1978 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued October 16, 1978, permitted to 3,600 ft.

It was permitted by Hinton Production Company and has since transferred to Arcadia Operating LLC on the wellbore schedule.

Completion filings report one formation top, including Woodbine.

Its lease has reported 136K barrels of oil and 32 mcf of gas since January 1993, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 162K barrels injected in the 12 months reported through June 2025.

Operator of record

Arcadia Operating LLC

Permitted by Hinton Production Company; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Nov 4, 2025 · 46 permits on file · (877) 918-5207

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleArcadia Operating LLC
Production reportsArcadia Operating, LLCthrough Aug 2025
Latest permitHinton Production CompanyOct 16, 1978

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,600
total depth, ft
1
permits on file
Oct 16, 1978
last permit issued
Nov 1, 1978
completed
136K
cumulative oil, bbl
32
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 1, 1978
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Davis, Pat "H" O-6-1606TalcoArcadia Operating, LLC5136K32Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 296 · prior 12 533(-44%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hinton Production CompanyJan 1993 → Nov 1994
  2. 2Arcadia Expl. & Prod. CompanyDec 1994 → Dec 2011
  3. 3Arcadia Operating, LLCJan 2012 → Aug 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
34640-99DrillHinton Production CompanyOct 16, 1978Oct 16, 1978Oct 22, 19783,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-1606————

Formation tops

As filed on W-2/G-1. Subsea from 363 ft elevation.Download CSV →

FormationMD ftSubsea
Woodbine2,936-2,573

Perforations

Perforated and open-hole intervals.

FromToType
3,0643,498Perforated
3,0653,160Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62510512.2580 S
2.8752,965——
73,5308.751,025 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 31, 1987May 11, 1987—
00Jan 12, 1984Jun 5, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

162K
bbl, last 12 reported months
25.7M
bbl, all reported
Jun 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000042919W-14 DisposalActive14,0001,5303,065–3,500

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 162,332 · prior 12 360,903(-55%)

020K40K60K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44930214, documented in the API reference.