WELL · 42-449-30231 · DISTRICT 6

Talco East Unit #1D

Plugged

Titus County · Talco field  · Vertical

Talco East Unit #1D (API 42-449-30231) is a plugged well in Titus County, plugged June 7, 2012, last operated by J.P. Oil Company Inc..

The RRC has issued one drilling permit, issued September 20, 1979, permitted to 3,550 ft.

It was permitted by Exxon Corp. and has since transferred to J.P. Oil Company Inc. on the wellbore schedule.

Its 2 leases have reported 2.67M barrels of oil and 22 mcf of gas since January 1993, last reporting in July 2026. The leases carry 135 wells, so these are lease totals, not this well alone.

Operator of record

J.P. Oil Company Inc.

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Lafayette, LA · P-5 Y, filed Feb 4, 2026 · (337) 234-1170

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJ.P. Oil Company Inc.
Production reportsJ.P. Oil Company, Inc.through Mar 2026
Latest permitExxon Corp.Sep 20, 1979

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,550
total depth, ft
1
permits on file
Sep 20, 1979
last permit issued
Sep 23, 1986
completed
2.67M
cumulative oil, bbl
22
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 23, 1986
Shut in
—
Plugged
Jun 7, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 135 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Talco East Unit O-6-15058TalcoJ.P. Oil Company, Inc.1292.62M0Feb 2012 – Jul 2026
McPeters, G. A. Act. #2 O-6-1683TalcoExxon Mobil Corporation653.9K22Jan 1993 – Jul 2013

Oil, barrels lease total

Last 12 months 103,778 · prior 12 123,839(-16%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Dec 2013
  3. 3XTO Energy Inc.Jan 2014 → Oct 2023
  4. 4J.P. Oil Company, Inc.Nov 2023 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
58491-99DrillExxon Corp.Sep 20, 1979Sep 20, 1979Nov 8, 19793,550

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-1683————
—— O-6-15058————

Perforations

Perforated and open-hole intervals.

FromToType
3,1903,470Perforated
3,4403,550Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
16100——
10.7546114.375650 S
10.7546414.75770 S
4.53,090——
73,4449.875925 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 31, 2012Mar 26, 1987—
00Apr 15, 1987Mar 26, 1987—
00Jan 12, 1984Oct 27, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Mar 1995
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000006170W-14 DisposalPlugged Jul 5, 201215,0006003,190–3,470

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119941995

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/44930231, documented in the API reference.