WELL · 42-449-30376 · DISTRICT 6
Hargrove John #1
Titus County · Talco field · Vertical
Hargrove John #1 (API 42-449-30376) is a plugged well in Titus County, plugged February 20, 1998, last operated by Rebel Well Service Inc..
The RRC has issued one drilling permit, issued December 20, 1982, permitted to 9,500 ft.
It was permitted by Currey, David M. and has since transferred to Rebel Well Service Inc. on the wellbore schedule.
Completion filings report 5 formation tops, including Bac, Wd, Pxy, BMA.
Operator of record
Permitted by Currey, David M.; the EWA schedule now lists a different operator.
Gilmer, TX · P-5 Y, filed Nov 7, 1997
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Rebel Well Service Inc. |
| Production reports | none |
| Latest permit | Currey, David M.Dec 20, 1982 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,500
- total depth, ft
- 1
- permits on file
- Dec 20, 1982
- last permit issued
- Jun 18, 1983
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 18, 1983
- Shut in
- —
- Plugged
- Feb 20, 1998
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hargrove, John O-6-11326 | Talco | Rebel Well Service, Inc. | 1 | 0 | 0 | Jan 1993 – Aug 2003 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 180876-99 | Drill | Currey, David M. | Mar 16, 1984 | Dec 20, 1982 | Jan 18, 1983 | 9,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-6-11326 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 303 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Bac | 2,851 | -2,548 |
| WD | 3,310 | -3,007 |
| Pxy | 4,942 | -4,639 |
| BMA | 6,850 | -6,547 |
| SMK | 8,590 | -8,287 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,940 | 3,980 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,530 | 12.25 | 1,026 S |
| 5.5 | 6,850 | 8.75 | 375 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 18, 1984 | Jul 13, 1983 | — |
| 00 | Apr 13, 1984 | Jul 13, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-449-30376 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-449-30376 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 211K
- bbl, all reported
- Mar 1988
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000051638 | W-14 Disposal | Plugged May 18, 1998 | 4,000 | 1,200 | 3,940–3,990 |
MONTHLY INJECTED, BBL · H-10 · LAST 1 REPORTED MONTHS
Last 12 months 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/44930376, documented in the API reference.