WELL · 42-451-00141 · DISTRICT 7

Mees Bettie #1

Plugged

Tom Green County · Veribest S. (Ellenburger) field  · Vertical

Mees Bettie #1 (API 42-451-00141) is a plugged well in Tom Green County, plugged November 22, 1978, last operated by Zinke & Philpy Inc..

The RRC has issued 2 drilling permits between 1978 and 1985, permitted to 5,120 ft.

It was permitted by Northington, Inc. and has since transferred to Zinke & Philpy Inc. on the wellbore schedule.

Completion filings report 5 formation tops, including Cisco, T/Palo Pinto Limestone, Harkey (Canyon) Sand, Strawn.

Operator of record

Zinke & Philpy Inc.

Permitted by Northington, Inc.; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Oct 15, 1987 · 31 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleZinke & Philpy Inc.
Production reportsnone
Latest permitNorthington, Inc.Feb 5, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,120
total depth, ft
2
permits on file
Feb 5, 1985
last permit issued
Jun 25, 1978
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 1996

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 25, 1978
Shut in
—
Plugged
Nov 22, 1978

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Mees, Doris G-9-115403Amn (Harkey)HMT Pipeline Company, Inc.100Jan 1993 – Oct 1996

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
266054-99OtherNorthington, Inc.Feb 5, 1985Feb 5, 1985—4,350
24844-99OtherZinke & Philpy, Inc.May 22, 1978May 22, 1978—5,120

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-9-115403————

Formation tops

As filed on W-2/G-1. Subsea from 1,823 ft elevation.Download CSV →

FormationMD ftSubsea
CiscoCISCO LIMESTONE3,152-1,329
T/Palo Pinto Limestone4,001-2,178
Harkey (Canyon) Sand4,259-2,436
StrawnSTRAWN LIMESTONE4,530-2,707
Ellenburger5,240-3,417

Perforations

Perforated and open-hole intervals.

FromToType
4,2604,270Perforated
4,7204,730Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62520112.7580 S
8.62570111125 S
4.54,3157.875—
4.55,1207.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 2, 1985Mar 11, 1985—
00Mar 30, 1985——
00Jan 12, 1984Jan 4, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45100141, documented in the API reference.