WELL · 42-451-00766 · DISTRICT 7
Dan #1
Tom Green County · Mt. Susan S. (Strn. Lime 5250) field · Vertical
Dan #1 (API 42-451-00766) is a plugged well in Tom Green County, plugged April 20, 1995, last operated by Bob Hughes Oil Company LLC.
The RRC has issued one drilling permit, issued October 28, 1983, permitted to 5,250 ft.
It was permitted by Wilbanks, Bruce A. and has since transferred to Bob Hughes Oil Company LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Harkey Sand, Harkey Sd, Strawn.
Operator of record
Permitted by Wilbanks, Bruce A.; the EWA schedule now lists a different operator.
San Angelo, TX · P-5 Y, filed Jan 4, 2026 · 17 permits on file · (325) 653-0693
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Bob Hughes Oil Company LLC |
| Production reports | none |
| Latest permit | Wilbanks, Bruce A.Oct 28, 1983 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,250
- total depth, ft
- 1
- permits on file
- Oct 28, 1983
- last permit issued
- Apr 10, 1986
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 10, 1986
- Shut in
- —
- Plugged
- Apr 20, 1995
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Dan O-9-11507 | Mt. Susan, S. (Strn. Lime 5250) | Bob Hughes Oil Company, LLC | 2 | 0 | 0 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 219042-99 | Other | Wilbanks, Bruce A. | Oct 24, 1983 | Oct 28, 1983 | Oct 22, 1983 | 5,250 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-11507 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,109 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Harkey Sand | 4,950 | -2,841 |
| Harkey SD | 4,950 | -2,841 |
| StrawnSTRAWN LIME | 5,240 | -3,131 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,987 | 4,995 | Perforated |
| 5,258 | 5,262 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 610 | — | — |
| 5.5 | 5,720 | 8.75 | 1,240 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 2, 1986 | Jun 24, 1986 | Yes |
| 00 | Sep 9, 1985 | Aug 15, 1985 | — |
| 00 | Sep 5, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-451-00766 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-451-00766 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 503K
- bbl, all reported
- May 1995
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000060653 | H-1 Injection | Plugged May 8, 1995 | 200 | 200 | 5,258–5,262 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/45100766, documented in the API reference.