WELL · 42-451-00782 · DISTRICT 7
Green J. Wiley -A- #3
Tom Green County · Susan Peak (Cisco Canyon) field · Vertical
Green J. Wiley -A- #3 (API 42-451-00782) is a plugged well in Tom Green County, plugged December 18, 2012, last operated by Compass Operating L.L.C..
The RRC has issued one drilling permit, issued January 8, 2004, permitted to 4,735 ft.
Completion filings report 2 formation tops, including Cisco, Strawn.
Its 2 leases have reported 77K barrels of oil and 245K mcf of gas since January 1993, last reporting in August 2018. The leases carry 6 wells, so these are lease totals, not this well alone.
Operator of record
Midland, TX · P-5 Y, filed Jun 4, 2026 · 15 permits on file · (432) 686-6008
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Compass Operating L.L.C. |
| Production reports | Compass Operating, L.L.C.through Jan 2018 |
| Latest permit | Compass Operating, L.L.C.Jan 8, 2004 |
- 4,735
- total depth, ft
- 1
- permits on file
- Jan 8, 2004
- last permit issued
- Aug 3, 2004
- completed
- 77K
- cumulative oil, bbl
- 245K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2018
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 3, 2004
- Shut in
- —
- Plugged
- Dec 18, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 6 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Green, J. Wiley -A- O-9-1965 | Susan Peak | Compass Operating, L.L.C. | 5 | 77K | 87K | Jan 1993 – Aug 2018 |
| Green, J. Wiley -A- G-9-206579 | Susan Peak (Cisco Canyon) | Compass Operating, L.L.C. | 1 | 0 | 158K | Aug 2004 – Dec 2012 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Marathon Oil CompanyJan 1993 → Oct 1994
- 2Costilla Petroleum CorporationNov 1994 → Jan 1997
- 3Costilla Energy, Inc.Feb 1997 → Jul 2000
- 4Cinco Resources Operating,l.l.c.Aug 2000 → Sep 2000
- 5Compass Operating, L.L.C.Nov 2000 → Jan 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 540344-99 | Recompletion | Compass Operating, L.L.C. | Jan 5, 2004 | Jan 8, 2004 | — | 4,735 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-9-206579 | — | — | — | — |
| — | — O-9-1965 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,123 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,325 | 4,335 | Perforated |
| 4,356 | 4,362 | Perforated |
| 4,374 | 4,378 | Perforated |
| — | 4,700 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 264 | 12 | 135 S |
| 5.5 | 4,706 | 7.875 | 265 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 17, 2005 | Nov 22, 2004 | Yes |
| 00 | Mar 4, 2005 | — | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-451-00782 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-451-00782 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/45100782, documented in the API reference.