WELL · 42-451-30902 · DISTRICT 7
Cot #2
Tom Green County · Vertical
Cot #2 (API 42-451-30902) is a plugged well in Tom Green County, plugged September 4, 2002, last operated by Mciver, Inc.
The RRC has issued 3 drilling permits (amended once) between 1982 and 1989, permitted to 4,800 ft.
Completion filings report 4 formation tops, including Palo Pinto, Harkey Sand, Strawn, Top Goen.
Its lease has reported 11.4K barrels of oil and 60.9K mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
San Angelo, TX · P-5 Y, filed Apr 4, 2008 · 52 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Hunt, Philthrough Nov 2001 |
| Latest permit | McDonald/NorthingtonJan 9, 1989 |
- 4,800
- total depth, ft
- 4
- permits on file
- Jan 9, 1989
- last permit issued
- —
- completed
- 11.4K
- cumulative oil, bbl
- 60.9K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Sep 4, 2002
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cot O-9-12595 | Veribest, S.E. (Harkey) | Hunt, Phil | 2 | 11.4K | 60.9K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Thomas Oil and Gas Inc.Feb 1993 → Sep 1996
- 2Hunt, PhilOct 1996 → Nov 2001
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 355020-98 | Reenter | McIver, Inc | Feb 13, 1989 | Jan 9, 1989 | — | 4,500 |
| 355020-99 | Reenter | McDonald/Northington | Jan 9, 1989 | Jan 9, 1989 | — | 4,500 |
| 193898-99 | Recompletion | Lovelady, Ike Inc. | May 9, 1983 | May 9, 1983 | — | 4,800 |
| 150971-99 | Drill | Lovelady, Ike Inc. | Feb 18, 1982 | Feb 18, 1982 | Feb 12, 1982 | 4,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-12595 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,813 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo Pinto | 4,066 | -2,253 |
| Harkey Sand | 4,192 | -2,379 |
| StrawnTOP STRAWN | 4,418 | -2,605 |
| Top Goen | 4,676 | -2,863 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,714 | 3,720 | Perforated |
| 4,194 | 4,198 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 362 | 17.5 | 425 S |
| 8.625 | 2,616 | 11 | 950 S |
| 2.375 | 3,652 | — | — |
| 5.5 | 4,735 | 7.875 | 320 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 24, 1989 | Feb 10, 1989 | — |
| 00 | Feb 21, 1989 | — | — |
| 00 | Jan 12, 1984 | Apr 21, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-451-30902 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-451-30902 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/45130902, documented in the API reference.