WELL · 42-451-31196 · DISTRICT 7
Jones #1
Tom Green County · Vertical
Jones #1 (API 42-451-31196) is a former disposal or injection well in Tom Green County, last operated by Dunagin Transport Company; its UIC permit is no longer active.
The RRC has issued 3 drilling permits between 1983 and 2013, permitted to 5,640 ft.
Completion filings report 2 formation tops, including Palo Pinto, Strawn.
Operator of record
Abilene, TX · P-5 Y, filed Jan 4, 2026 · 4 permits on file · (325) 928-5253
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Dunagin Transport CompanyOct 18, 2013 |
- 5,640
- total depth, ft
- 3
- permits on file
- Oct 18, 2013
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2014
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Jones O-9-12697 | Kenker (Palo Pinto) | Dunagin Transport Company | 1 | 0 | 0 | Jan 1993 – Jun 2014 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 771702-99 | Recompletion | Dunagin Transport Company | Oct 14, 2013 | Oct 18, 2013 | — | 5,640 |
| 355287-99 | Reenter | Focus Petroleum, Inc. | Jan 18, 1989 | Jan 19, 1989 | — | 5,569 |
| 191264-99 | Drill | Giebel, Aaron F. | Apr 11, 1983 | Apr 11, 1983 | Apr 15, 1983 | 5,569 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-12697 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,004 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo Pinto | 5,360 | -3,356 |
| StrawnSTRAWN LIME | 5,528 | -3,524 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,448 | 5,452 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 425 | 17.5 | 400 S |
| 8.625 | 3,906 | 12.25 | 2,150 S |
| 4.5 | 5,558 | 7.875 | 445 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 9, 2012 | Oct 27, 2011 | — |
| 00 | Feb 20, 1990 | Jan 31, 1990 | — |
| 00 | Sep 7, 1989 | Aug 11, 1989 | Yes |
| 00 | Aug 31, 1989 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-451-31196 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-451-31196 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 109K
- bbl, last 12 reported months
- 2.4M
- bbl, all reported
- Jan 2014
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000070537 | H-1 Injection | Plugged Jan 16, 2014 | 10,000 | 2,724 | 5,448–5,452 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 109,443 · prior 12 836,510(-87%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/45131196, documented in the API reference.