WELL · 42-451-31685 · DISTRICT 7
Dierschke Unit #1
Tom Green County · Schniers field · Vertical
Dierschke Unit #1 (API 42-451-31685) is a plugged well in Tom Green County, plugged October 18, 2008, last operated by Fortune Production CO..
The RRC has issued one drilling permit, issued January 29, 1986, permitted to 5,000 ft.
Completion filings report 3 formation tops, including Palo Pinto, Harkey, Strawn.
Its lease has reported 3.49K barrels of oil and 17.8K mcf of gas since January 1993, last reporting in December 2008.
Operator of record
San Angelo, TX · P-5 Y, filed Jan 8, 2010 · 153 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Fortune Production Co. |
| Production reports | Fortune Production Co.through Apr 1998 |
| Latest permit | Fortune Production Co.Jan 29, 1986 |
- 5,000
- total depth, ft
- 1
- permits on file
- Jan 29, 1986
- last permit issued
- Jul 16, 1999
- completed
- 3.49K
- cumulative oil, bbl
- 17.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 16, 1999
- Shut in
- —
- Plugged
- Oct 18, 2008
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Dierschke Unit O-9-11832 | Schniers | Fortune Production Co. | 1 | 3.49K | 17.8K | Jan 1993 – Dec 2008 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Fortune Production Co.Jan 1993 → Apr 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 296873-99 | Drill | Fortune Production Co. | Jan 24, 1986 | Jan 29, 1986 | Jan 31, 1986 | 5,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-11832 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,870 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo Pinto | 4,245 | -2,375 |
| Harkey | 4,430 | -2,560 |
| Strawn | 4,683 | -2,813 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,684 | 4,687 | Perforated |
| 4,684 | 4,741 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 303 | 12.25 | 225 S |
| 4.5 | 4,809 | 7.875 | 270 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 27, 2000 | Aug 9, 1999 | — |
| 00 | Mar 24, 1986 | Mar 11, 1986 | Yes |
| 00 | Mar 21, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-451-31685 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-451-31685 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 36K
- bbl, last 12 reported months
- 284K
- bbl, all reported
- Jan 2008
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000088967 | H-1 Injection | Plugged Nov 3, 2008 | 1,000 | 2,300 | 4,684–4,770 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 35,953 · prior 12 20,916(+72%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/45131685, documented in the API reference.