WELL · 42-451-31705 · DISTRICT 7

Johnson D. J. B #2

Plugged

Tom Green County · Hour (Strawn) field  · Vertical

Johnson D. J. B #2 (API 42-451-31705) is a plugged well in Tom Green County, plugged July 30, 1996, last operated by Smith Pipe Of Abilene.

The RRC has issued one drilling permit, issued April 9, 1986, permitted to 5,650 ft.

It was permitted by Burns, Bill C. and has since transferred to Smith Pipe Of Abilene on the wellbore schedule.

Completion filings report 3 formation tops, including Coleman Junction, Palo Pinto, Strawn.

Its lease has reported 10.6K barrels of oil and 30 mcf of gas since January 1993, last reporting in September 1996. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Smith Pipe of Abilene

Permitted by Burns, Bill C.; the EWA schedule now lists a different operator.

Abilene, TX · P-5 Y, filed Jul 3, 2024 · (325) 665-4407

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSmith Pipe of Abilene
Production reportsBurns, Bill C.through Jul 1995
Latest permitBurns, Bill C.Apr 9, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,650
total depth, ft
1
permits on file
Apr 9, 1986
last permit issued
Nov 6, 1986
completed
10.6K
cumulative oil, bbl
30
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 1996

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 6, 1986
Shut in
—
Plugged
Jul 30, 1996

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Johnson, D. J. "B" O-9-11849Hour (Strawn)Smith Pipe of Abilene210.6K30Jan 1993 – Sep 1996

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Burns, Bill C.Jan 1993 → Jul 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
300892-99DrillBurns, Bill C.Apr 9, 1986Apr 9, 1986Apr 15, 19865,650

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-11849————

Formation tops

As filed on W-2/G-1. Subsea from 1,980 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman Junction3,740-1,760
Coleman JunctionCOLEMAN JUNCTION (BTM)3,740-1,760
Palo Pinto5,265-3,285
Strawn5,505-3,525

Perforations

Perforated and open-hole intervals.

FromToType
5,5305,540Perforated
5,5305,580Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37524217.5350 S
8.6253,98911910 S
4.55,6407.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 8, 1987Dec 30, 1986—
00Sep 2, 1986Aug 22, 1986—
00Aug 29, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

66.9K
bbl, last 12 reported months
649K
bbl, all reported
Jan 1996
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000061603H-1 InjectionPlugged Sep 4, 19962,2001,5005,530–5,560

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 66,919 · prior 12 191,889(-65%)

010K20K19951996

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45131705, documented in the API reference.