WELL · 42-451-31915 · DISTRICT 7

Tweedy #24

Y

Tom Green County · Atkinson W. (San Angelo) field · Injection  · Vertical

Tweedy #24 (API 42-451-31915) is a well in Tom Green County operated by Lainco Inc., completed March 22, 2001 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued November 4, 1988, permitted to 1,200 ft.

It was permitted by Swartz, Guy A. and has since transferred to Lainco Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Whitehorse, Grayburg, San Andres.

Its lease has reported 449K barrels of oil and 625 mcf of gas since January 1993, last reporting in July 2026. The lease carries 42 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 2.43K barrels injected in the 12 months reported through January 2026.

Operator of record

Lainco Inc.

Permitted by Swartz, Guy A.; the EWA schedule now lists a different operator.

Hamlin, TX · P-5 Y, filed May 4, 2026 · 8 permits on file · (325) 721-5502

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLainco Inc.
Production reportsLainco, Inc.through Mar 2026
Latest permitSwartz, Guy A.Nov 4, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,200
total depth, ft
1
permits on file
Nov 4, 1988
last permit issued
Mar 22, 2001
completed
449K
cumulative oil, bbl
625
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 22, 2001
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 42 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Tweedy O-9-9252Atkinson, W. (San Angelo)Lainco, Inc.42449K625Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 3,604 · prior 12 4,235(-15%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Swartz, Guy A.Jan 1993 → Aug 1993
  2. 2Swartz Oil CompanySep 1993 → Jul 2016
  3. 3Caminar Oil & Gas, LLCAug 2016 → Aug 2024
  4. 4Lainco, Inc.Sep 2024 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
352988-99DrillSwartz, Guy A.Nov 3, 1988Nov 4, 1988—1,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-9252————

Formation tops

As filed on W-2/G-1. Subsea from 2,150 ft elevation.Download CSV →

FormationMD ftSubsea
Whitehorse2001,950
Grayburg5051,645
San Andres5421,608

Perforations

Perforated and open-hole intervals.

FromToType
810820Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
5.5882802 S
5.58827.875200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 21, 2002Mar 28, 2001—
00Dec 13, 1989Nov 17, 1989Yes
00Nov 30, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

2.43K
bbl, last 12 reported months
130K
bbl, all reported
Jan 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000086807H-1 InjectionActive1001,000810–820

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 2,430 · prior 12 1,160(+109%)

020040020252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45131915, documented in the API reference.