WELL · 42-451-31942 · DISTRICT 7

Rust Estate #1

N

Tom Green County  · Vertical

Rust Estate #1 (API 42-451-31942) is a permitted well in Tom Green County filed by Oakhurst Oil Company; no completion report is on file yet.

The RRC has issued 3 drilling permits between 1989 and 1992, permitted to 7,000 ft.

Completion filings report 3 formation tops, including Coleman Junction, Palo Pinto, Lower Capps (Canyon).

Operator of record

Oakhurst Oil Company

Dallas, TX · P-5 Y, filed Nov 7, 2003 · 8 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitOakhurst Oil CompanyOct 19, 1992
7,000
total depth, ft
3
permits on file
Oct 19, 1992
last permit issued
—
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2008

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rust Estate O-9-12660Bald Eagle (Canyon)Oakhurst Oil Company100Jan 1993 – Mar 2008

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
404618-99RecompletionOakhurst Oil CompanyOct 13, 1992Oct 19, 1992Oct 31, 19926,550
372104-99RecompletionOakhurst Oil CompanyApr 12, 1990Apr 16, 1990—6,550
357994-99DrillOakhurst Oil CompanyApr 10, 1989Apr 10, 1989—7,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-12660————

Formation tops

As filed on W-2/G-1. Subsea from 2,355 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman JunctionBASE COLEMAN JUNCTION3,340-985
Palo Pinto5,558-3,203
Lower Capps (Canyon)5,880-3,525

Perforations

Perforated and open-hole intervals.

FromToType
5,8825,890Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62529011135 S
5.55,9437.875315 S
5.5—7.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 23, 1989Jun 5, 1989Yes
00Jun 21, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45131942, documented in the API reference.