WELL · 42-451-32062 · DISTRICT 7
West Pate #301
Tom Green County · Eliza Baker North (Caddo) field · Vertical
West Pate #301 (API 42-451-32062) is a plugged well in Tom Green County, plugged December 19, 2006, last operated by J & J Services Company.
The RRC has issued one drilling permit, issued May 8, 1991, permitted to 6,500 ft.
It was permitted by Sandstone Oil & Gas and has since transferred to J & J Services Company on the wellbore schedule.
Completion filings report 6 formation tops, including Palo Pinto, Strawn, Goen Lime, Gardner Lime.
Its lease has reported 4.72K barrels of oil and 12.2K mcf of gas since January 1993, last reporting in October 2008.
Operator of record
Permitted by Sandstone Oil & Gas; the EWA schedule now lists a different operator.
San Angelo, TX · P-5 Y, filed Jul 4, 2026 · 13 permits on file · (325) 656-5770
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | J & J Services Company |
| Production reports | J & J Services Companythrough Aug 1999 |
| Latest permit | Sandstone Oil & GasMay 8, 1991 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,500
- total depth, ft
- 1
- permits on file
- May 8, 1991
- last permit issued
- Jul 6, 1991
- completed
- 4.72K
- cumulative oil, bbl
- 12.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 6, 1991
- Shut in
- —
- Plugged
- Dec 19, 2006
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| West Pate O-9-13110 | Eliza Baker, North (Caddo) | J & J Services Company | 1 | 4.72K | 12.2K | Jan 1993 – Oct 2008 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Sandstone Operating Company, IncJan 1993 → Jan 1993
- 2Moore, John D.Feb 1993 → May 1994
- 3J & J Services CompanyJun 1994 → Jul 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 387299-99 | Drill | Sandstone Oil & Gas | Apr 30, 1991 | May 8, 1991 | May 17, 1991 | 6,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-13110 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,260 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo Pinto | 5,168 | -2,908 |
| StrawnSTRAWN CAPPS | 5,516 | -3,256 |
| Goen Lime | 5,786 | -3,526 |
| Gardner Lime | 5,946 | -3,686 |
| Lower Odem | 6,166 | -3,906 |
| CaddoUPPER CADDO | 6,249 | -3,989 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,276 | 6,286 | Perforated |
| 6,300 | 6,309 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 414 | 11 | 225 S |
| 4.5 | 6,316 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 16, 1991 | Jul 31, 1991 | Yes |
| 00 | Aug 15, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-451-32062 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-451-32062 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/45132062, documented in the API reference.