WELL · 42-451-32247 · DISTRICT 7

Rathbone #1209

Plugged

Tom Green County  · Vertical

Rathbone #1209 (API 42-451-32247) is a plugged well in Tom Green County, plugged January 25, 2011, last operated by TS Operating CO..

The RRC has issued 2 drilling permits (amended once) between 1993 and 2004, permitted to 1,200 ft.

Completion filings report 2 formation tops, including T/San Andres, T/San Angelo.

Its 2 leases have reported 27.4K barrels of oil and 101 mcf of gas since January 1993, last reporting in October 2016. The leases carry 14 wells, so these are lease totals, not this well alone.

Operator of record

TS Operating Co.

San Angelo, TX · P-5 Y, filed Oct 7, 2005 · 2 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsSwartz Oil Companythrough Mar 2016
Latest permitTS Operating Co.Jan 22, 2004
1,200
total depth, ft
3
permits on file
Jan 22, 2004
last permit issued
—
completed
27.4K
cumulative oil, bbl
101
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2016

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jan 25, 2011

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 14 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rathbone O-9-10066McIntire (San Angelo)Swartz Oil Company1327K96Jan 1993 – Oct 2016
Rathbone O-9-13508Atkinson, W. (San Angelo)Stevens & Tull, Inc.13075Sep 1993 – May 1994

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Rocky Mountain ResourcesJan 1993 → Jan 1993
  2. 2Stevens & Tull, Inc.Feb 1993 → Apr 1994
  3. 3B & R Operating, LLCMay 1994 → Dec 2000
  4. 4TS Operating Co.Jan 2001 → Dec 2004
  5. 5Swartz Oil CompanyApr 2005 → Mar 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
541007-99ReenterTS Operating Co.Jan 20, 2004Jan 22, 2004Apr 10, 20071,000
412968-98DrillStevens & Tull, Inc.Feb 16, 1994Jun 24, 1993—1,200
412968-99DrillStevens & Tull, Inc.Jun 18, 1993Jun 24, 1993Aug 15, 19931,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-10066————
—— O-9-13508————

Formation tops

As filed on W-2/G-1. Subsea from 2,346 ft elevation.Download CSV →

FormationMD ftSubsea
T/San Andres8381,508
T/San Angelo9141,432

Perforations

Perforated and open-hole intervals.

FromToType
908914Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62542011250 S
5.59087.5260 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 4, 1994Sep 21, 1993Yes
00Dec 8, 1993Sep 21, 1993Yes
00Sep 29, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Jan 2005
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000094975H-1 InjectionPlugged Feb 20, 19961001,000906–907
000093667H-1 InjectionCanceled Jan 12, 20051001,000908–914

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 0

012005

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45132247, documented in the API reference.