WELL · 42-451-32563 · DISTRICT 7
Lee #5
Tom Green County · Star Light (Hope) field · Vertical
Lee #5 (API 42-451-32563) is a plugged well in Tom Green County, plugged March 3, 2025, last operated by Star Production Inc..
The RRC has issued 3 drilling permits between 2007 and 2010, permitted to 3,000 ft.
Completion filings report 9 formation tops, including Waldrip Lime, Waldrip Lm, Hope, Hope Lime.
Its 3 leases have reported 501K barrels of oil and 227 mcf of gas since May 2006, last reporting in July 2026. The leases carry 15 wells, so these are lease totals, not this well alone.
Operator of record
Dallas, TX · P-5 Y, filed Jan 5, 2026 · 192 permits on file · (214) 213-8656
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Star Production Inc. |
| Production reports | Star Production, Inc.through Apr 2026 |
| Latest permit | Star Production, Inc.Jan 13, 2010 |
- 3,000
- total depth, ft
- 3
- permits on file
- Jan 13, 2010
- last permit issued
- Feb 17, 2009
- completed
- 501K
- cumulative oil, bbl
- 227
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2006 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 17, 2009
- Shut in
- —
- Plugged
- Mar 3, 2025
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 15 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Lee O-9-15948 | Star Light (Palo Pinto) | Star Production, Inc. | 5 | 178K | 27 | May 2006 – Jul 2026 |
| Lee O-9-16710 | Star Light (Hope) | Star Production, Inc. | 6 | 321K | 197 | Sep 2008 – Jul 2026 |
| Lee O-9-16686 | Star Light (Breckenridge) | Star Production, Inc. | 4 | 2.25K | 3 | Aug 2008 – Aug 2013 |
Oil, barrels lease total
Last 12 months 5,849 · prior 12 6,199(-6%)
Gas, mcf lease total
Last 12 months 12 · prior 12 12(+0%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Star Production, Inc.May 2006 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 687988-99 | Recompletion | Star Production, Inc. | Nov 30, 2009 | Jan 13, 2010 | Feb 2, 2009 | 3,000 |
| 676037-99 | Recompletion | Star Production, Inc. | Dec 9, 2008 | Dec 12, 2008 | Jan 29, 2009 | 3,000 |
| 647663-99 | Drill | Star Production, Inc. | Oct 11, 2007 | Oct 17, 2007 | Nov 30, 2007 | 3,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-15948 | — | — | — | — |
| — | — O-9-16686 | — | — | — | — |
| — | — O-9-16710 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,820 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Waldrip Lime | 2,272 | -452 |
| Waldrip LM | 2,272 | -452 |
| Hope | 2,375 | -555 |
| Hope Lime | 2,375 | -555 |
| Hope LM | 2,375 | -555 |
| Breckenridge | 2,495 | -675 |
| Breckenridge Lime | 2,495 | -675 |
| Breckenridge LM | 2,495 | -675 |
| Palo Pinto | 2,630 | -810 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,394 | 2,402 | Perforated |
| 2,562 | 2,566 | Perforated |
| 2,635 | 2,638 | Perforated |
| 2,635 | 2,668 | Perforated |
| 2,648 | 2,653 | Perforated |
| 2,658 | 2,668 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 132 | 17.5 | 160 S |
| 8.625 | 2,177 | 11 | 400 S |
| 5.5 | 2,800 | 7.875 | 225 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 10, 2010 | Feb 1, 2010 | — |
| 00 | Apr 16, 2010 | Jan 22, 2010 | — |
| 00 | Mar 30, 2010 | Jan 20, 2010 | Yes |
| 00 | Mar 30, 2010 | Jan 12, 2010 | Yes |
| 00 | Feb 2, 2010 | — | — |
| 00 | Jan 27, 2010 | — | — |
| 00 | Feb 25, 2008 | Jan 7, 2008 | Yes |
| 00 | Feb 4, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-451-32563 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-451-32563 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/45132563, documented in the API reference.