WELL · 42-455-30450 · DISTRICT 3

Temple #1

Plugged

Trinity County · Apple Springs (James) field  · Vertical

Temple #1 (API 42-455-30450) is a plugged well in Trinity County, plugged October 13, 1998, last operated by Antara Resources Inc..

The RRC has issued one drilling permit, issued January 21, 1997, permitted to 12,500 ft.

It was permitted by Araxas Exploration, Inc. and has since transferred to Antara Resources Inc. on the wellbore schedule.

Completion filings report 5 formation tops, including Buda, Glen Rose, Rodessa, James Lime.

Operator of record

Antara Resources Inc.

Permitted by Araxas Exploration, Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Apr 13, 2001 · 3 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAntara Resources Inc.
Production reportsAntara Resources, Inc.through Sep 1997
Latest permitAraxas Exploration, Inc.Jan 21, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,500
total depth, ft
1
permits on file
Jan 21, 1997
last permit issued
Sep 16, 1997
completed
0
cumulative oil, bbl
756
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 1997 THROUGH Oct 1998

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 16, 1997
Shut in
—
Plugged
Oct 13, 1998

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Temple G-3-172930Apple Springs (James)Antara Resources, Inc.10756Sep 1997 – Oct 1998

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Antara Resources, Inc.Sep 1997 → Sep 1997

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
457602-99DrillAraxas Exploration, Inc.Jan 21, 1997Jan 21, 1997Feb 19, 199712,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-172930————

Formation tops

As filed on W-2/G-1. Subsea from 274 ft elevation.Download CSV →

FormationMD ftSubsea
Buda7,555-7,281
Glen Rose8,563-8,289
Rodessa9,874-9,600
James LimeJAMES10,849-10,575
PettitPETTET11,158-10,884

Perforations

Perforated and open-hole intervals.

FromToType
11,24111,261Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,30012.25780 S
711,7288.75560 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 26, 1999Dec 15, 1997Yes
00Jun 3, 1999——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45530450, documented in the API reference.