WELL · 42-455-30450 · DISTRICT 3
Temple #1
Trinity County · Apple Springs (James) field · Vertical
Temple #1 (API 42-455-30450) is a plugged well in Trinity County, plugged October 13, 1998, last operated by Antara Resources Inc..
The RRC has issued one drilling permit, issued January 21, 1997, permitted to 12,500 ft.
It was permitted by Araxas Exploration, Inc. and has since transferred to Antara Resources Inc. on the wellbore schedule.
Completion filings report 5 formation tops, including Buda, Glen Rose, Rodessa, James Lime.
Operator of record
Permitted by Araxas Exploration, Inc.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Apr 13, 2001 · 3 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Antara Resources Inc. |
| Production reports | Antara Resources, Inc.through Sep 1997 |
| Latest permit | Araxas Exploration, Inc.Jan 21, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,500
- total depth, ft
- 1
- permits on file
- Jan 21, 1997
- last permit issued
- Sep 16, 1997
- completed
- 0
- cumulative oil, bbl
- 756
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 1997 THROUGH Oct 1998
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 16, 1997
- Shut in
- —
- Plugged
- Oct 13, 1998
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Temple G-3-172930 | Apple Springs (James) | Antara Resources, Inc. | 1 | 0 | 756 | Sep 1997 – Oct 1998 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Antara Resources, Inc.Sep 1997 → Sep 1997
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 457602-99 | Drill | Araxas Exploration, Inc. | Jan 21, 1997 | Jan 21, 1997 | Feb 19, 1997 | 12,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-172930 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 274 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Buda | 7,555 | -7,281 |
| Glen Rose | 8,563 | -8,289 |
| Rodessa | 9,874 | -9,600 |
| James LimeJAMES | 10,849 | -10,575 |
| PettitPETTET | 11,158 | -10,884 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,241 | 11,261 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,300 | 12.25 | 780 S |
| 7 | 11,728 | 8.75 | 560 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 26, 1999 | Dec 15, 1997 | Yes |
| 00 | Jun 3, 1999 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-455-30450 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-455-30450 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/45530450, documented in the API reference.