WELL · 42-455-30452 · DISTRICT 3
Great West CMT #1H
Trinity County · Cameron Lake (Austin Chalk) field · Temp Abandoned · Horizontal
Great West Cmt #1H (API 42-455-30452) is a horizontal well in Trinity County operated by Garrison Operating L.L.C., completed September 19, 1997 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit, issued June 19, 1997, permitted to 10,500 ft.
It was permitted by Swift Energy Company and has since transferred to Garrison Operating L.L.C. on the wellbore schedule.
Completion filings report one formation top, including Austin Chalk.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Swift Energy Company; the EWA schedule now lists a different operator.
Tomball, TX · P-5 Y, filed Jul 4, 2026 · 1 permits on file · (713) 444-3030
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Garrison Operating L.L.C. |
| Production reports | Garrison Operating, L.L.C.through Jun 2013 |
| Latest permit | Swift Energy CompanyJun 19, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,500
- total depth, ft
- 1
- permits on file
- Jun 19, 1997
- last permit issued
- Sep 19, 1997
- completed
- 0
- cumulative oil, bbl
- 321K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 1997 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Sep 19, 1997
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Great West CMT G-3-170161 | Cameron Lake (Austin Chalk) | Garrison Operating, L.L.C. | 1 | 0 | 321K | Sep 1997 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Swift Energy CompanyOct 1997 → Sep 2002
- 2Trinidad Exploration, Inc.Oct 2002 → Feb 2003
- 3SDG Operating Company, IncMar 2003 → Sep 2004
- 4Garrison Operating, L.L.C.Nov 2004 → Jun 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 464013-99 | Drill | Swift Energy Company | Jun 19, 1997 | Jun 19, 1997 | Jun 28, 1997 | 10,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-170161 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 305 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin Chalk | 9,900 | -9,595 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,904 | 13,394 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,603 | 14.75 | 1,370 S |
| 7.625 | 9,904 | 9.875 | 695 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 26, 1998 | Dec 4, 1997 | — |
| 00 | Oct 8, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-455-30452 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-455-30452 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/45530452, documented in the API reference.