WELL · 42-457-00228 · DISTRICT 3
Kirby-McInnis #10
Tyler County · Vertical
Kirby-Mcinnis #10 (API 42-457-00228) is a disposal or injection well in Tyler County operated by R B C Production CO. under an active UIC permit.
The RRC has issued 2 drilling permits between 1979 and 1982, permitted to 8,630 ft.
Completion filings report 2 formation tops, including Yegua, Wilcox.
It holds an active disposal or injection permit, with 36.8K barrels injected in the 12 months reported through December 2025.
Operator of record
Silsbee, TX · P-5 Y, filed Jul 15, 1991 · 13 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Morris, W. Dale Inc.through Jun 2003 |
| Latest permit | R B C Production Co.Nov 15, 1982 |
- 8,630
- total depth, ft
- 2
- permits on file
- Nov 15, 1982
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 108K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Kirby-McInnis G-3-103318 | Theuvenins Creek (Yegua 1 -D) | Lucky Lad Energy, LLC | 1 | 0 | 108K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Seminole Production Co.Jan 1993 → Oct 2002
- 2Morris, W. Dale Inc.Nov 2002 → Jun 2003
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 177340-99 | Other | R B C Production Co. | Nov 15, 1982 | Nov 15, 1982 | — | 8,630 |
| 64267-99 | Other | R B C Production Co. | Nov 20, 1979 | Nov 20, 1979 | — | 8,630 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-103318 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,498 | 5,502 | Perforated |
| 5,635 | 5,700 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,740 | — | — |
| 2.375 | 5,449 | — | — |
| 5.5 | 8,629 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 11, 2010 | Feb 10, 2010 | — |
| 00 | Jan 12, 1984 | Dec 6, 1982 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-457-00228 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-457-00228 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 36.8K
- bbl, last 12 reported months
- 478K
- bbl, all reported
- Dec 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000100688 | W-14 Disposal | Active | 2,000 | 1,000 | 5,635–5,700 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 36,800 · prior 12 28,325(+30%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/45700228, documented in the API reference.