WELL · 42-457-00354 · DISTRICT 3

Kirby - Milhome #2 K

N

Tyler County · Blackhome (Wilcox 8575) field  · Vertical

Kirby - Milhome #2 K (API 42-457-00354) is a well in Tyler County operated by Sinclair Carl Oil Well Service, completed November 1, 1966.

The RRC has issued one drilling permit, issued August 28, 1991, permitted to 9,253 ft.

It was permitted by Anderson Petro-Equipment, Inc. and has since transferred to Sinclair Carl Oil Well Service on the wellbore schedule.

Completion filings report 6 formation tops, including Catahoula, Frio, Vicksburg, Jackson.

Its 2 leases have reported 9.51K barrels of oil and 5.85K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Sinclair Carl Oil Well Service

Permitted by Anderson Petro-Equipment, Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Aug 15, 1984

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSinclair Carl Oil Well Service
Production reportsNeches Transport Inc.through Apr 2026
Latest permitAnderson Petro-Equipment, Inc.Aug 28, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,253
total depth, ft
1
permits on file
Aug 28, 1991
last permit issued
Nov 1, 1966
completed
9.51K
cumulative oil, bbl
5.85K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 1, 1966
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kirby Millhome 4K,LLC O-3-22009Blackhome (Wilcox 8575)Neches Transport Inc.19.51K5.85KMay 1993 – Jul 2026
Kirby-Milhome G-3-139317Blackhome (Wilcox 8575)Anderson Petro-Equipment, Inc.101Jan 1993 – Sep 1993

Oil, barrels lease total

Last 12 months 22 · prior 12 49(-55%)

051015202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anderson Petro-Equipment, Inc.Jan 1993 → Mar 1995
  2. 2International ConsultantsMay 1995 → Apr 2011
  3. 3Kirby Millhome 4K, LLCJul 2011 → Oct 2014
  4. 4Jeffcoat Production Company Inc.Jan 2015 → Dec 2020
  5. 5J3 Operating LLCJan 2021 → Aug 2024
  6. 6Neches Transport Inc.Sep 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
391353-99ReenterAnderson Petro-Equipment, Inc.Aug 28, 1991Aug 28, 1991Aug 28, 19919,253

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-139317————
—— O-3-22009————

Formation tops

As filed on W-2/G-1. Subsea from 73 ft elevation.Download CSV →

FormationMD ftSubsea
Catahoula2,920-2,847
Frio3,050-2,977
Vicksburg4,190-4,117
Jackson4,480-4,407
Yegua5,470-5,397
Wilcox8,425-8,352

Perforations

Perforated and open-hole intervals.

FromToType
8,4348,575Perforated
8,5698,575Perforated
8,5738,579Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,738151,900 S
5.59,2538.6252,280 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 2, 1993May 17, 1993—
00May 25, 1993——
00Oct 1, 1991Sep 18, 1991—
00Sep 26, 1991——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45700354, documented in the API reference.