WELL · 42-457-00368 · DISTRICT 3

Kirby Millhome 4K LLC #4

Y

Tyler County · Blackhome (Wilcox 8900) field · Producing  · Vertical

Kirby Millhome 4k LLC #4 (API 42-457-00368) is a well in Tyler County operated by Neches Transport Inc., completed October 20, 1991 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued September 3, 1991, permitted to 9,077 ft.

It was permitted by Anderson Petro-Equipment, Inc. and has since transferred to Neches Transport Inc. on the wellbore schedule.

Completion filings report 6 formation tops, including Catahoula, Frio, Vicksburg, Jackson.

Its lease has reported 56.3K barrels of oil and 14K mcf of gas since January 1993, last reporting in July 2026.

Operator of record

Neches Transport Inc.

Permitted by Anderson Petro-Equipment, Inc.; the EWA schedule now lists a different operator.

Spurger, TX · P-5 Y, filed Oct 4, 2025 · 1 permits on file · (409) 429-4403

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNeches Transport Inc.
Production reportsNeches Transport Inc.through Apr 2026
Latest permitAnderson Petro-Equipment, Inc.Sep 3, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,077
total depth, ft
1
permits on file
Sep 3, 1991
last permit issued
Oct 20, 1991
completed
56.3K
cumulative oil, bbl
14K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 20, 1991
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kirby Millhome 4K, LLC O-3-21253Blackhome (Wilcox 8900)Neches Transport Inc.156.3K14KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 23 · prior 12 103(-78%)

0204060202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anderson Petro-Equipment, Inc.Jan 1993 → Mar 1995
  2. 2International ConsultantsMay 1995 → Apr 2011
  3. 3Kirby Millhome 4K, LLCJul 2011 → Oct 2014
  4. 4Jeffcoat Production Company Inc.Jan 2015 → Dec 2020
  5. 5J3 Operating LLCJan 2021 → Aug 2024
  6. 6Neches Transport Inc.Sep 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
391386-99ReenterAnderson Petro-Equipment, Inc.Aug 29, 1991Sep 3, 1991Sep 27, 19919,077

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-21253————

Formation tops

As filed on W-2/G-1. Subsea from 12 ft elevation.Download CSV →

FormationMD ftSubsea
Catahoula2,910-2,898
Frio3,035-3,023
Vicksburg4,160-4,148
Jackson4,460-4,448
Yegua5,450-5,438
Wilcox8,415-8,403

Perforations

Perforated and open-hole intervals.

FromToType
8,8608,870Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,650151,900 S
5.59,0878.752,524 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 30, 1993Mar 15, 1993—
00Dec 9, 1991Nov 13, 1991—
00Dec 4, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45700368, documented in the API reference.