WELL · 42-457-30318 · DISTRICT 3

East Texas Oil Company Fee 'G' #7

N

Tyler County  · Vertical

East Texas Oil Company Fee 'G' #7 (API 42-457-30318) is a permitted well in Tyler County filed by Milestone Operating, Inc.; no completion report is on file yet.

The RRC has issued 5 drilling permits between 1980 and 2012, permitted to 12,000 ft.

Completion filings report 4 formation tops, including Cockfield, Crockett, T/Wilcox, Wilcox.

Its 2 leases have reported 266K barrels of oil and 794K mcf of gas since January 1993, last reporting in July 2026. The leases carry 6 wells, so these are lease totals, not this well alone.

Operator of record

Milestone Operating, Inc.

Montgomery, TX · P-5 Y, filed Dec 4, 2025 · 90 permits on file · (936) 447-1174

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsMilestone Operating, Inc.through Mar 2026
Latest permitMilestone Operating, Inc.Nov 8, 2012
12,000
total depth, ft
5
permits on file
Nov 8, 2012
last permit issued
—
completed
266K
cumulative oil, bbl
794K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
East Texas Oil Co. Fee -G- O-3-2085HicksbaughMilestone Operating, Inc.4167K752KJan 1993 – Jul 2026
East Texas Oil Co. Fee -G- O-3-26209Hicksbaugh (Wilcox 5)Milestone Operating, Inc.299.2K41.8KOct 2012 – Jul 2026

Oil, barrels lease total

Last 12 months 6,773 · prior 12 5,655(+20%)

05001K202420252026

Gas, mcf lease total

Last 12 months 2,618 · prior 12 1,671(+57%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Dstj CorporationJan 1993 → Mar 2001
  2. 2Milestone Operating, Inc.Apr 2001 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
750953-99RecompletionMilestone Operating, Inc.Nov 5, 2012Nov 8, 2012Aug 6, 20129,663
305376-99RecompletionExxon Corp.Aug 6, 1986Aug 14, 1986—11,655
274393-99RecompletionExxon Corp.May 6, 1985May 7, 1985—11,655
118629-99RecompletionExxon Corp.May 20, 1981May 20, 1981—11,655
72297-99DrillExxon Corp.Feb 11, 1980Feb 11, 1980Apr 7, 198012,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-2085————
—— O-3-26209————

Formation tops

As filed on W-2/G-1. Subsea from 130 ft elevation.Download CSV →

FormationMD ftSubsea
Cockfield5,402-5,272
Crockett6,695-6,565
T/Wilcox8,368-8,238
WilcoxMID-WILCOX9,740-9,610

Perforations

Perforated and open-hole intervals.

FromToType
8,3988,420Perforated
8,7678,773Perforated
8,7698,772Perforated
9,7469,942Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,09212.251,295 S
2.8758,263——
5.510,7488.751,885 S
2.87511,655——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 29, 2014Nov 15, 2012Yes
00Jun 28, 1990Apr 20, 1990Yes
00Jun 6, 1990——
00Jan 12, 1984May 20, 1981—
00Jan 12, 1984Feb 23, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45730318, documented in the API reference.