WELL · 42-457-30434 · DISTRICT 3

Hodge E. J. #5

Y

Tyler County · Hillister E. (Cockfield Fifth) field · Producing  · Vertical

Hodge E. J. #5 (API 42-457-30434) is a well in Tyler County operated by Neches Transport Inc., completed October 25, 1989 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued February 14, 1989, permitted to 4,950 ft.

It was permitted by North Texas Oil Exploration, Inc and has since transferred to Neches Transport Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Cockfield (A-1), Cockfield (A-3), Cockfield (A-5).

Its lease has reported 74.5K barrels of oil and 83 mcf of gas since January 1993, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

Neches Transport Inc.

Permitted by North Texas Oil Exploration, Inc; the EWA schedule now lists a different operator.

Spurger, TX · P-5 Y, filed Oct 4, 2025 · 1 permits on file · (409) 429-4403

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNeches Transport Inc.
Production reportsNeches Transport Inc.through Apr 2026
Latest permitNorth Texas Oil Exploration, IncFeb 14, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,950
total depth, ft
1
permits on file
Feb 14, 1989
last permit issued
Oct 25, 1989
completed
74.5K
cumulative oil, bbl
83
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 25, 1989
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hodge, E. J. O-3-2147Hillister, E. (Cockfield Fifth)Neches Transport Inc.374.5K83Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 1,037 · prior 12 525(+98%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Arista Novelty, Inc.Jan 1993 → Dec 1994
  2. 2Auden Oil Inc.Jan 1995 → May 1996
  3. 3D-Mil Production, Inc.Jun 1996 → Dec 1999
  4. 4F.I.G. Energy, LLCJan 2000 → Jul 2002
  5. 5Morris, W. Dale Inc.Oct 2002 → Jun 2003
  6. 6Encore Energy, Inc.Oct 2007 → Mar 2015
  7. 7Felderhoff Production CompanyApr 2015 → Dec 2019
  8. 8Neches Transport Inc.Jun 2020 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
356015-99DrillNorth Texas Oil Exploration, IncFeb 13, 1989Feb 14, 1989—4,950

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-2147————

Formation tops

As filed on W-2/G-1. Subsea from 173 ft elevation.Download CSV →

FormationMD ftSubsea
Cockfield (A-1)4,658-4,485
Cockfield (A-3)4,777-4,604
Cockfield (A-5)4,910-4,737

Perforations

Perforated and open-hole intervals.

FromToType
4,7744,777Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,4687.875260 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 27, 1990Mar 15, 1990Yes
00Jun 23, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45730434, documented in the API reference.