WELL · 42-457-30466 · DISTRICT 3
Arco Fee #3
Tyler County · Highbaugh (Wilcox 9800 Sand) field · Vertical
Arco Fee #3 (API 42-457-30466) is a well in Tyler County operated by Pecos Petroleum Company, completed April 5, 1993.
The RRC has issued 4 drilling permits between 1992 and 1999, permitted to 11,000 ft.
Completion filings report 2 formation tops, including Yegua, Wilcox.
Its 4 leases have reported 363K barrels of oil and 1.83M mcf of gas since April 1993, last reporting in July 2026. The leases carry 10 wells, so these are lease totals, not this well alone.
Operator of record
Houston, TX · P-5 Y, filed Jul 11, 2003 · 87 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Pecos Petroleum Company |
| Production reports | Neches Transport Inc.through Apr 2026 |
| Latest permit | Pecos Petroleum CompanyNov 10, 1999 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,000
- total depth, ft
- 4
- permits on file
- Nov 10, 1999
- last permit issued
- Apr 5, 1993
- completed
- 363K
- cumulative oil, bbl
- 1.83M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 5, 1993
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 10 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Arco Fee O-3-23520 | Highbaugh (Wilcox 8700 Sand) | Neches Transport Inc. | 4 | 177K | 478K | May 1998 – Jul 2026 |
| Arco Fee O-3-23087 | Highbaugh (Wilcox Rochna Sand) | Roberson Oil Company | 1 | 49.2K | 249K | Apr 1996 – Jan 2001 |
| Arco Fee O-3-22203 | Highbaugh (Geronimo Lo. WX) | Roberson Oil Company | 4 | 136K | 653K | Nov 1993 – Oct 2000 |
| Arco Fee G-3-144831 | Highbaugh (Wilcox 9800 Sand) | Pecos Petroleum Company | 1 | 0 | 446K | Apr 1993 – Aug 1994 |
Oil, barrels lease total
Last 12 months 383 · prior 12 227(+69%)
Gas, mcf lease total
Last 12 months 8 · prior 12 722(-99%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pecos Petroleum CompanyApr 1993 → Oct 1999
- 2Roberson Oil CompanyNov 1999 → Nov 2002
- 3American Coastal Energy, Inc.Dec 2002 → Feb 2005
- 4Amorah, L.L.C.Mar 2005 → Jul 2005
- 5Forest Oil CorporationAug 2005 → Nov 2010
- 6McDaniel Company, Inc., TheDec 2010 → Dec 2017
- 7Hydrocarbon Operating, Inc.Jan 2018 → Dec 2025
- 8Neches Transport Inc.Feb 2026 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 489323-99 | Recompletion | Pecos Petroleum Company | Nov 9, 1999 | Nov 10, 1999 | Nov 16, 1999 | 11,000 |
| 446699-99 | Recompletion | Pecos Petroleum Company | Apr 8, 1996 | Apr 8, 1996 | Apr 9, 1996 | 9,200 |
| 424349-99 | Recompletion | Pecos Petroleum Company | May 31, 1994 | May 31, 1994 | May 27, 1994 | 11,000 |
| 407375-99 | Drill | Pecos Petroleum Company | Dec 17, 1992 | Dec 17, 1992 | Jan 12, 1993 | 11,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-144831 | — | — | — | — |
| — | — O-3-22203 | — | — | — | — |
| — | — O-3-23087 | — | — | — | — |
| — | — O-3-23520 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 108 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,688 | 8,700 | Perforated |
| 8,724 | 8,736 | Perforated |
| 8,748 | 8,760 | Perforated |
| 9,008 | 9,014 | Perforated |
| 9,020 | 9,030 | Perforated |
| 9,054 | 9,062 | Perforated |
| 9,190 | 9,200 | Perforated |
| 9,744 | 9,755 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,570 | 11 | 490 S |
| 5.5 | 9,916 | 7.875 | 795 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 24, 2001 | Jan 2, 2001 | Yes |
| 00 | Jan 12, 2001 | Oct 29, 1996 | Yes |
| 00 | Nov 25, 1996 | Oct 29, 1996 | Yes |
| 00 | Nov 14, 1996 | Jun 8, 1994 | Yes |
| 00 | Jun 17, 1994 | Jun 8, 1994 | Yes |
| 00 | Jun 14, 1994 | — | — |
| 00 | May 5, 1993 | Apr 19, 1993 | Yes |
| 00 | Apr 27, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-457-30466 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-457-30466 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/45730466, documented in the API reference.