WELL · 42-457-30493 · DISTRICT 3

Vastar Fee 307 #2

N

Tyler County · Turkey Bayou (Upper Wilcox) field  · Directional

Vastar Fee 307 #2 (API 42-457-30493) is a well in Tyler County operated by Hanson Production Company, completed June 9, 1995.

The RRC has issued one drilling permit, issued January 13, 1995, permitted to 11,000 ft.

Completion filings report 4 formation tops, including Yegua, Wilcox, Wx (Odem)Sand, Wx Odem Sand.

Its 2 leases have reported 27.5K barrels of oil and 91.5K mcf of gas since June 1995, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Hanson Production Company

Cuero, TX · P-5 Y, filed May 8, 2015 · 111 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHanson Production Company
Production reportsMorris, W. Dale Inc.through Dec 2008
Latest permitHanson Production CompanyJan 13, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,000
total depth, ft
1
permits on file
Jan 13, 1995
last permit issued
Jun 9, 1995
completed
27.5K
cumulative oil, bbl
91.5K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 1995 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 9, 1995
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Vastar Fee 307 O-3-22797Turkey Bayou (Upper Wilcox)Neches Transport Inc.227.5K84.5KJun 1995 – Jul 2026
Vastar Fee 307 G-3-156435Turkey Bayou (Upper Wilcox)Hanson Production Company106.98KJun 1995 – Sep 1996

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hanson Production CompanyJun 1995 → Oct 1998
  2. 2Setex Oil and Gas CompanyNov 1998 → Feb 2002
  3. 3Morris, W. Dale Inc.Jul 2006 → Dec 2008

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
431258-99DrillHanson Production CompanyDec 22, 1994Jan 13, 1995Jan 21, 199511,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-156435————
—— O-3-22797————

Formation tops

As filed on W-2/G-1. Subsea from 119 ft elevation.Download CSV →

FormationMD ftSubsea
YeguaTOP OF YEGUA5,590-5,471
Yegua5,590-5,471
YeguaBASE OF YEGUA7,260-7,141
WilcoxTOP OF WILCOX9,068-8,949
Wilcox9,068-8,949
WX (Odem)sand9,530-9,411
WX Odem Sand9,530-9,411

Perforations

Perforated and open-hole intervals.

FromToType
4,2364,246Perforated
9,0709,079Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,21212.25690 S
4.510,8358.75880 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 24, 2007Jul 3, 2006—
00Aug 14, 1996Mar 11, 1996Yes
00Jul 30, 1996——
00Jan 31, 1996Jul 24, 1995Yes
00Jan 3, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
118K
bbl, all reported
Feb 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000096394W-14 DisposalActive1,0001,7003,400–4,500

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45730493, documented in the API reference.