WELL · 42-457-30537 · DISTRICT 3

Nash et AL #1

Plugged

Tyler County  · Horizontal

Nash ET AL #1 (API 42-457-30537) is a plugged horizontal well in Tyler County, plugged May 15, 2006, last operated by Ergon Energy Partners, L.P..

The RRC has issued one drilling permit (amended twice), issued February 23, 2001, permitted to 14,500 ft.

Operator of record

Ergon Energy Partners, L.P.

Jackson, MS · P-5 Y, filed Dec 4, 2025 · 94 permits on file · (318) 322-1414

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitErgon Energy Partners, L.P.Mar 25, 2002
14,500
total depth, ft
3
permits on file
Mar 25, 2002
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
May 15, 2006

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
505771-97DrillErgon Energy Partners, L.P.Mar 25, 2002Mar 25, 2002Apr 13, 200114,500
505771-98DrillErgon Energy Partners, L.P.Feb 25, 2002Feb 23, 2001—14,500
505771-99DrillErgon Exploration, Inc.Feb 23, 2001Feb 23, 2001Apr 13, 200114,500

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45730537, documented in the API reference.