WELL · 42-457-30864 · DISTRICT 3
BP Cheyenne #1
Tyler County · Hillister E. (y-3 South) field · Directional
BP Cheyenne #1 (API 42-457-30864) is a plugged well in Tyler County, plugged August 14, 2017, last operated by Davis Southern Operating CO LLC.
The RRC has issued 2 drilling permits between 2014 and 2016, permitted to 7,000 ft.
Completion filings report 6 formation tops, including Frio, Yegua, Cockfield - Disposal, Crockett-Cook - Disposal.
Its 2 leases have reported 3.09K barrels of oil and 29.6K mcf of gas since January 2015, last reporting in August 2023. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Davis Southern Operating Co LLC
Houston, TX · P-5 Y, filed Jan 4, 2026 · 127 permits on file · (713) 299-0787
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Davis Southern Operating Co LLC |
| Production reports | Davis Southern Operating Co LLCthrough Apr 2017 |
| Latest permit | Davis Southern Operating Co LLCAug 2, 2016 |
- 7,000
- total depth, ft
- 2
- permits on file
- Aug 2, 2016
- last permit issued
- Jan 23, 2015
- completed
- 3.09K
- cumulative oil, bbl
- 29.6K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2015 THROUGH Aug 2023
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 23, 2015
- Shut in
- —
- Plugged
- Aug 14, 2017
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| BP Cheyenne G-3-281476 | Hillister, East (Y-2) | Davis Southern Operating Co LLC | 1 | 0 | 17.3K | Aug 2016 – Aug 2023 |
| BP Cheyenne O-3-26732 | Hillister, E. (y-3, South) | Davis Southern Operating Co LLC | 1 | 3.09K | 12.3K | Jan 2015 – Aug 2023 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Davis Southern Operating Co LLCJan 2015 → Apr 2017
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 817377-99 | Recompletion | Davis Southern Operating Co LLC | Jul 28, 2016 | Aug 2, 2016 | Aug 2, 2016 | 6,000 |
| 796303-99 | Drill | Davis Southern Operating Co LLC | Sep 15, 2014 | Sep 30, 2014 | Nov 19, 2014 | 7,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-281476 | — | — | — | — |
| — | — O-3-26732 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 157 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| FrioFRIO - DISPOSAL | 3,138 | -2,981 |
| FrioFRIO - DISPOSAL | 3,139 | -2,982 |
| YeguaYEGUA - DISPOSAL | 4,700 | -4,543 |
| Cockfield - Disposal | 4,770 | -4,613 |
| Crockett-Cook - Disposal | — | — |
| Miocene (undifferentiated)MIOCENE - DISPOSAL | — | — |
| VicksburgVICKSBURG - DISPOSAL | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,079 | 5,083 | Perforated |
| 5,236 | 5,239 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,510 | 12.25 | 460 S |
| 5.5 | 6,020 | 8.75 | 1,190 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 13, 2016 | Sep 29, 2016 | — |
| 00 | Jul 14, 2015 | Apr 13, 2015 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-457-30864 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-457-30864 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/45730864, documented in the API reference.