WELL · 42-459-30672 · DISTRICT 6

Exxon-Fina L.V. Ray GU NO.1 #2

Plugged

Upshur County  · Vertical

Exxon-Fina L.V. Ray GU NO.1 #2 (API 42-459-30672) is a plugged well in Upshur County, plugged June 30, 2004, last operated by Mobley Oilfield Services, LP.

The RRC has issued 2 drilling permits (amended once) between 1989 and 2004, permitted to 19,000 ft.

Operator of record

Mobley Oilfield Services, LP

Kilgore, TX · P-5 Y, filed Oct 5, 2007 · 3 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitMobley Oilfield Services, LPMar 19, 2004
19,000
total depth, ft
3
permits on file
Mar 19, 2004
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jun 30, 2004

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
543464-99ReenterMobley Oilfield Services, LPMar 19, 2004Mar 19, 2004Mar 5, 20044,210
361021-98DrillExxon Corp.Jan 5, 1990Jun 30, 1989—19,000
361021-99DrillExxon Corp.Jun 30, 1989Jun 30, 1989Jul 29, 198918,500

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Jul 2010
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000093725W-14 DisposalPlugged Jun 30, 20043,5001,9003,800–4,100

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120092010

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45930672, documented in the API reference.