WELL · 42-459-31225 · DISTRICT 6

Craig J.V. GU 1 #4

N

Upshur County · Gilmer S. (Cotton Valley) field  · Vertical

Craig J.V. GU 1 #4 (API 42-459-31225) is a well in Upshur County operated by Peak Energy Corporation, completed December 20, 2004.

The RRC has issued 2 drilling permits between 2004 and 2006, permitted to 12,100 ft.

Completion filings report 7 formation tops, including Rhodessa, Rodessa, James Lime, Pettit.

No lease production has been reported under this well’s leases.

Operator of record

Peak Energy Corporation

Plano, TX · P-5 Y, filed Nov 2, 2018 · 35 permits on file · (800) 752-6628

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePeak Energy Corporation
Production reportsRose City Resources, LLCthrough Apr 2026
Latest permitPeak Energy CorporationDec 12, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,100
total depth, ft
2
permits on file
Dec 12, 2006
last permit issued
Dec 20, 2004
completed
0
cumulative oil, bbl
507K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2004 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 20, 2004
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Craig, J.V. Gas Unit 1 G-6-226193Gilmer (Cotton Valley Sands)Rose City Resources, LLC10458KDec 2006 – Jul 2026
Craig, J.V. GU 1 G-6-208992Gilmer, S. (Cotton Valley)Peak Energy Corporation1048.9KDec 2004 – Dec 2006

Gas, mcf lease total

Last 12 months 9,502 · prior 12 13,465(-29%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Peak Energy CorporationJan 2005 → Oct 2018
  2. 2American Patriot Operating Corp.Nov 2018 → May 2021
  3. 3King Operating CorporationJun 2021 → Jun 2021
  4. 4Sabine Oil & Gas CorporationDec 2022 → Oct 2023
  5. 5Rose City Resources, LLCNov 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
630413-99RecompletionPeak Energy CorporationDec 12, 2006Dec 12, 2006Dec 20, 200612,100
552569-99DrillPeak Energy CorporationOct 20, 2004Oct 20, 2004Oct 26, 200412,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-208992————
—— G-6-226193————

Formation tops

As filed on W-2/G-1. Subsea from 367 ft elevation.Download CSV →

FormationMD ftSubsea
Rhodessa7,114-6,747
Rodessa7,114-6,747
James Lime7,612-7,245
Pettit7,765-7,398
Travis Peak7,936-7,569
BossierBOSSIER SHALE10,984-10,617
Cotton ValleyCOTTON VALLEY LIME11,424-11,057

Perforations

Perforated and open-hole intervals.

FromToType
10,61810,744Perforated
11,48411,644Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6254,179111,140 S
5.511,9417.8752,050 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 22, 2008Feb 27, 2008—
00Dec 3, 2007Mar 22, 2007Yes
00Apr 25, 2007——
00Aug 23, 2005Mar 31, 2005Yes
00Jun 30, 2005——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45931225, documented in the API reference.