WELL · 42-461-30156 · DISTRICT 7
Flour, Neal #1
Upton County · Vertical
Flour, Neal #1 (API 42-461-30156) is a permitted well in Upton County filed by Purvis Operating CO.; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1979 and 1999, permitted to 11,500 ft.
Its 3 leases have reported 1.1K barrels of oil and 312K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Midland, TX · P-5 Y, filed Jun 4, 2026 · 62 permits on file · (432) 682-7346
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Arena Production Companythrough Oct 2010 |
| Latest permit | Purvis Operating Co.Jan 15, 1999 |
- 11,500
- total depth, ft
- 2
- permits on file
- Jan 15, 1999
- last permit issued
- —
- completed
- 1.1K
- cumulative oil, bbl
- 312K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Neal-Fluor O-9-15501 | Benedum (Fusselman) | Arena Production Company | 1 | 1.1K | 7.36K | Nov 2003 – Jul 2026 |
| Fluor, Neal G-9-132961 | Benedum (Wolfcamp) | Purvis Operating Co. | 1 | 0 | 305K | Jan 1993 – Apr 2004 |
| — O-9-7945 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Brown, Tom Inc.Jan 1993 → Oct 1994
- 2Purvis, J. H.Nov 1994 → Dec 1994
- 3Purvis Operating Co.Jan 1995 → Jan 2005
- 4Arena Production CompanyMay 2005 → Oct 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 481977-99 | Recompletion | Purvis Operating Co. | Jan 11, 1999 | Jan 15, 1999 | — | 11,242 |
| 48977-99 | Other | Brown, Tom Inc. | May 22, 1979 | May 22, 1979 | — | 11,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-9-132961 | — | — | — | — |
| — | — O-9-7945 | — | — | — | — |
| — | — O-9-15501 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,491 | — | Perforated |
| 9,498 | 9,520 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 420 | 12.25 | 300 S |
| 7 | 7,700 | 8.75 | 650 S |
| 2.375 | 9,385 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 9, 2004 | — | — |
| 00 | Apr 20, 1990 | Feb 6, 1990 | — |
| 00 | Apr 4, 1990 | — | — |
| 00 | Jan 12, 1984 | Jul 27, 1979 | — |
| 00 | Jan 12, 1984 | May 1, 1973 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-461-30156 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-461-30156 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46130156, documented in the API reference.