WELL · 42-461-32182 · DISTRICT 7

King Ranch Oil & Lignite Co. #3

Plugged

Upton County · Mc Camey field  · Vertical

King Ranch Oil & Lignite CO. #3 (API 42-461-32182) is a plugged well in Upton County, plugged November 21, 1984, last operated by Rkg Engineering Inc..

The RRC has issued one drilling permit, issued May 2, 1984, permitted to 3,100 ft.

It was permitted by R. K. G. Engineering, Inc. and has since transferred to Rkg Engineering Inc. on the wellbore schedule.

Operator of record

RKG Engineering Inc.

Permitted by R. K. G. Engineering, Inc.; the EWA schedule now lists a different operator.

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitR. K. G. Engineering, Inc.May 2, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,100
total depth, ft
1
permits on file
May 2, 1984
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Nov 21, 1984

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
237358-99DrillR. K. G. Engineering, Inc.Apr 20, 1984May 2, 1984May 6, 19843,100

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000052980H-1 InjectionPlugged Dec 3, 1984002,675–0

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/46132182, documented in the API reference.