WELL · 42-461-32263 · DISTRICT 7
Mesa #1
Upton County · Castle Gap (San Andres) field · Producing · Vertical
Mesa #1 (API 42-461-32263) is a well in Upton County operated by Eagle Capital Partners LLC, completed November 29, 1984 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued September 12, 1984, permitted to 3,600 ft.
It was permitted by Purvis, J. H. and has since transferred to Eagle Capital Partners LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Queen, Grayburg, San Andres.
Its lease has reported 18.5K barrels of oil and 20 mcf of gas since January 1993, last reporting in July 2026.
Operator of record
Permitted by Purvis, J. H.; the EWA schedule now lists a different operator.
Eunice, NM · P-5 Y, filed Jun 4, 2026 · 2 permits on file · (972) 523-0448
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Eagle Capital Partners LLC |
| Production reports | Eagle Capital Partners, LLCthrough Mar 2026 |
| Latest permit | Purvis, J. H.Sep 12, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,600
- total depth, ft
- 1
- permits on file
- Sep 12, 1984
- last permit issued
- Nov 29, 1984
- completed
- 18.5K
- cumulative oil, bbl
- 20
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Nov 29, 1984
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mesa O-9-11149 | Castle Gap (San Andres) | Eagle Capital Partners, LLC | 1 | 18.5K | 20 | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 18 · prior 12 13(+38%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Purvis, J. H.Jan 1993 → Dec 1994
- 2Purvis Operating Co.Jan 1995 → Jun 2013
- 3Silver Creek Oil & Gas, LLCJul 2013 → Oct 2015
- 4Bustamante Resources LLCNov 2019 → Sep 2021
- 5Eagle Capital Partners, LLCApr 2022 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 251088-99 | Drill | Purvis, J. H. | Jan 28, 1985 | Sep 12, 1984 | Oct 5, 1984 | 3,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-11149 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,123 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Queen | 2,717 | 406 |
| Grayburg | 3,089 | 34 |
| San Andres | 3,406 | -283 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,216 | 3,292 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 595 | 11 | 375 S |
| 5.5 | 3,436 | 7.875 | 550 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 11, 1985 | Jan 28, 1985 | — |
| 00 | Feb 7, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-461-32263 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-461-32263 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46132263, documented in the API reference.