WELL · 42-467-30700 · DISTRICT 5

Heddin A. C. #1

Y

Van Zandt County · Norcabarro (James Lime) field · Producing  · Vertical

Heddin A. C. #1 (API 42-467-30700) is a well in Van Zandt County operated by Floex Energy LLC, completed January 24, 2022 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued June 21, 1988, permitted to 8,400 ft.

It was permitted by Edge, Robert L. and has since transferred to Floex Energy LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Kiamichi, Goodland, Paluxy, Glen Rose.

Its lease has reported 49.8K barrels of oil and 37.2K mcf of gas since January 1993, last reporting in July 2026.

Operator of record

Floex Energy LLC

Permitted by Edge, Robert L.; the EWA schedule now lists a different operator.

Tyler, TX · P-5 Y, filed Jan 4, 2026 · (903) 714-4827

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleFloex Energy LLC
Production reportsFloex Energy LLCthrough Apr 2026
Latest permitEdge, Robert L.Jun 21, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,400
total depth, ft
1
permits on file
Jun 21, 1988
last permit issued
Jan 24, 2022
completed
49.8K
cumulative oil, bbl
37.2K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 24, 2022
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Heddin, A. C. O-5-3279Norcabarro (James Lime)Floex Energy LLC149.8K37.2KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 3,113 · prior 12 4,024(-23%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Egl Oil and Gas CorporationJan 1993 → Jan 1996
  2. 2Brothers Resources, Inc.Aug 1997 → Aug 1998
  3. 3Southwest Operating, Inc.-TylerApr 2000 → Mar 2001
  4. 4Atlantis Oil Company, Inc.Apr 2001 → Apr 2003
  5. 5Crest Engineering Services,inc.Jun 2022 → Mar 2023
  6. 6Floex Energy LLCDec 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
347991-99DrillEdge, Robert L.Jun 20, 1988Jun 21, 1988Jul 19, 19888,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-5-3279————

Formation tops

As filed on W-2/G-1. Subsea from 542 ft elevation.Download CSV →

FormationMD ftSubsea
Kiamichi6,173-5,631
Goodland6,255-5,713
Paluxy6,341-5,799
Glen RoseUPPER GLEN ROSE6,623-6,081
James Lime7,605-7,063
Massive Anhydrite (marker)BASE MASSIVE ANHYDRITE7,836-7,294
James LimeJAMES8,141-7,599

Perforations

Perforated and open-hole intervals.

FromToType
8,1508,157Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,26911265 S
4.58,1507.875260 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 31, 2022Mar 17, 2022—
00Dec 7, 1988Oct 11, 1988Yes
00Nov 23, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/46730700, documented in the API reference.