WELL · 42-467-30746 · DISTRICT 5
Blake R.S. #34
Van Zandt County · Van (Austin Chalk) field · Vertical
Blake R.S. #34 (API 42-467-30746) is a plugged well in Van Zandt County, plugged January 21, 2015, last operated by Wagner Oil Company.
The RRC has issued one drilling permit, issued May 12, 1989, permitted to 2,900 ft.
It was permitted by Exxon Corp. and has since transferred to Wagner Oil Company on the wellbore schedule.
Completion filings report 4 formation tops, including Nacatoch, Austin Chalk, Lewisville, Dexter.
Its lease has reported 53.1K barrels of oil and 89.5K mcf of gas since January 1993, last reporting in June 2015. The lease carries 11 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Exxon Corp.; the EWA schedule now lists a different operator.
Fort Worth, TX · P-5 Y, filed Sep 4, 2025 · 278 permits on file · (800) 457-5332
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Wagner Oil Company |
| Production reports | Exxon Corp.through Nov 1998 |
| Latest permit | Exxon Corp.May 12, 1989 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,900
- total depth, ft
- 1
- permits on file
- May 12, 1989
- last permit issued
- Aug 9, 1989
- completed
- 53.1K
- cumulative oil, bbl
- 89.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2015
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 9, 1989
- Shut in
- —
- Plugged
- Jan 21, 2015
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 11 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Blake, R.S. O-5-3255 | Van (Austin Chalk) | Wagner Oil Company | 11 | 53.1K | 89.5K | Jan 1993 – Jun 2015 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → Nov 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 359255-99 | Drill | Exxon Corp. | May 12, 1989 | May 12, 1989 | Jul 19, 1989 | 2,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-5-3255 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 508 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Nacatoch | 1,330 | -822 |
| Austin ChalkAUSTIN | 2,221 | -1,713 |
| Lewisville | 2,580 | -2,072 |
| Dexter | 2,790 | -2,282 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,240 | 2,390 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 467 | 11 | 290 S |
| 5.5 | 2,873 | 7.875 | 600 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 18, 1990 | Dec 1, 1989 | Yes |
| 00 | Jan 12, 1990 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-467-30746 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-467-30746 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46730746, documented in the API reference.