WELL · 42-467-30931 · DISTRICT 5

Browning #1

N

Van Zandt County  · Vertical

Browning #1 (API 42-467-30931) is a permitted well in Van Zandt County filed by Three Forks Operating CO, LLC; no completion report is on file yet.

The RRC has issued 3 drilling permits between 1995 and 2017, permitted to 8,000 ft.

Completion filings report 14 formation tops, including Nacatoch, Pecan Gap, Austin Chalk, Sub-Clarksville.

Its 2 leases have reported 5.71K barrels of oil and 614K mcf of gas since February 1995, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Three Forks Operating Co, LLC

Flatonia, TX · P-5 Y, filed Sep 7, 2018 · 20 permits on file · (361) 772-4910

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsCinron Energy, LLCthrough Jun 2023
Latest permitThree Forks Operating Co, LLCFeb 8, 2017
8,000
total depth, ft
3
permits on file
Feb 8, 2017
last permit issued
—
completed
5.71K
cumulative oil, bbl
614K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 1995 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Browning O-5-4302Van, West (Glen Rose)Cinron Energy, LLC15.71K0Feb 2017 – Jul 2026
Browning G-5-154741Van, West (Rodessa-Carlile B)Three Forks Operating Co, LLC10614KFeb 1995 – Feb 2017

Oil, barrels lease total

Last 12 months 0 · prior 12 0

051015202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Crawford and Cameron GroupFeb 1995 → Feb 1997
  2. 2Crawford Energy, IncorporatedMar 1997 → Dec 2001
  3. 3Crawford Energy Operating CoJan 2002 → Aug 2008
  4. 4Crawford Hughes Operating Co.Sep 2008 → Jul 2015
  5. 5Three Forks Operating Co, LLCFeb 2017 → Nov 2017
  6. 6C&P Resources Operating Co,llcDec 2017 → Feb 2022
  7. 7Cinron Energy, LLCMar 2022 → Jun 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
822680-99RecompletionThree Forks Operating Co, LLCJan 31, 2017Feb 8, 2017—8,000
468084-99RecompletionCrawford Energy, IncorporatedSep 26, 1997Sep 26, 1997—8,000
431614-99DrillCrawford and Cameron GroupJan 6, 1995Jan 6, 1995Jan 9, 19958,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-154741————
—— O-5-4302————

Formation tops

As filed on W-2/G-1. Subsea from 508 ft elevation.Download CSV →

FormationMD ftSubsea
Nacatoch1,200-692
Pecan Gap1,590-1,082
Pecan Gap1,790-1,282
Austin Chalk2,270-1,762
Sub-Clarksville2,700-2,192
Ausitn Chalk2,750-2,242
Woodbine3,000-2,492
Woodbine3,198-2,690
Buda3,967-3,459
Paluxy5,200-4,692
Glenn Rose5,400-4,892
Rosessa6,110-5,602
James LimeJAMES6,328-5,820
Travis Peak6,780-6,272
Rodessa8,150-7,642
Smackover12,000-11,492

Perforations

Perforated and open-hole intervals.

FromToType
5,4865,492Perforated
6,2716,287Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62546111148 S
4.57,9577.8751,365 S
4.57,957—1,444 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 13, 2017Mar 8, 2017Yes
00Aug 25, 1995May 1, 1995Yes
00Jul 27, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.