WELL · 42-469-00705 · DISTRICT 2
Lisa Marie #2
Victoria County · Vertical
Lisa Marie #2 (API 42-469-00705) is a former disposal or injection well in Victoria County, last operated by Phere Operating Inc; its UIC permit is no longer active.
The RRC has issued 2 drilling permits between 1984 and 2011, permitted to 7,265 ft.
Operator of record
Spring Branch, TX · P-5 Y, filed Jun 4, 2026 · 22 permits on file · (214) 802-1335
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Phere Operating IncNov 18, 2011 |
- 7,265
- total depth, ft
- 2
- permits on file
- Nov 18, 2011
- last permit issued
- —
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 728113-99 | Reenter | Phere Operating Inc | Nov 10, 2011 | Nov 18, 2011 | — | 7,265 |
| 247383-99 | Other | Sue-Ann Oil & Gas Company | Jul 25, 1984 | Aug 6, 1984 | — | 7,260 |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 13, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-469-00705 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-469-00705 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000053440 | H-1 Injection | Plugged Jul 29, 1987 | 0 | 0 | 2,450–0 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46900705, documented in the API reference.