WELL · 42-469-02920 · DISTRICT 2

Keeran Ranch #C 2

Plugged

Victoria County · Kentucky Mott (5880 Sand) field  · Vertical

Keeran Ranch #C 2 (API 42-469-02920) is a plugged well in Victoria County, plugged May 31, 2023, last operated by Klotzman M. S. Exploration CO..

The RRC has issued one drilling permit, issued October 5, 2004, permitted to 3,420 ft.

Its 2 leases have reported 61K barrels of oil and 52.5K mcf of gas since January 1993, last reporting in May 2023. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Klotzman M. S. Exploration Co.

Victoria, TX · P-5 Y, filed Dec 4, 2025 · 64 permits on file · (361) 573-2416

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleKlotzman M. S. Exploration Co.
Production reportsKlotzman, M. S. Exploration Co.through Oct 2016
Latest permitKlotzman, M. S. Exploration Co.Oct 5, 2004
3,420
total depth, ft
1
permits on file
Oct 5, 2004
last permit issued
—
completed
61K
cumulative oil, bbl
52.5K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2023

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
May 31, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Keeran Ranch G-2-206934Keeran, Southeast (3350)GBS Oil & Gas, LLC109.89KOct 2004 – May 2023
Keeran Ranch O-2-2236Kentucky Mott (5880 Sand)Klotzman, M. S. Exploration Co.361K42.6KJan 1993 – Mar 2005

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Janex Oil Co., Inc.Jan 1993 → Jun 1994
  2. 2Goldking Prod. Co.Jul 1994 → Jun 1995
  3. 3Western Gulf Oil & Gas Inc.Jul 1995 → Nov 1997
  4. 4Ambrit Energy Corp.Dec 1997 → May 1999
  5. 5Castle Exploration Company, IncJun 1999 → Jun 2001
  6. 6Klotzman, M. S. Exploration Co.Nov 2001 → Oct 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
551760-99RecompletionKlotzman, M. S. Exploration Co.Sep 30, 2004Oct 5, 2004Oct 5, 20043,420

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-206934————
—— O-2-2236————
—— O-2-2236————

Perforations

Perforated and open-hole intervals.

FromToType
3,3803,386Perforated
3,6823,710Perforated
5,2905,310Perforated
5,8845,888Perforated
5,8845,962Perforated
5,9065,920Perforated
5,9385,944Perforated
5,9505,956Perforated
5,9565,962Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,52915615 S
9.6251,529——
5.56,238——
5.56,2988.75450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 22, 2005Oct 21, 2004Yes
00Mar 22, 2005——
00Aug 22, 2002Apr 25, 2001—
00Nov 6, 2001Apr 25, 2001—
00Oct 10, 2001Jul 30, 2001—
00Apr 8, 1986Mar 21, 1986Yes
00Nov 1, 1985Oct 3, 1985—
00Sep 5, 1985Aug 15, 1985—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
5.22M
bbl, all reported
Jul 2004
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000001709H-1 InjectionPlugged Jun 12, 20232,5001,7503,500–4,050

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120032004

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/46902920, documented in the API reference.