WELL · 42-469-02926 · DISTRICT 2

Keeran G, Etal #20

Plugged

Victoria County  · Vertical

Keeran G, Etal #20 (API 42-469-02926) is a plugged well in Victoria County, plugged December 4, 2008, last operated by Total Production Services, Inc..

The RRC has issued one drilling permit, issued June 24, 1986, permitted to 7,750 ft.

Its lease has reported 3.03K barrels of oil and 604 mcf of gas since January 1993, last reporting in July 2026. The lease carries 9 wells, so these are lease totals, not this well alone.

Operator of record

Total Production Services, Inc.

Houston, TX · P-5 Y, filed Nov 3, 2007 · 2 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsRemora Management, LLCthrough Jul 2012
Latest permitTotal Production Services, Inc.Jun 24, 1986
7,750
total depth, ft
1
permits on file
Jun 24, 1986
last permit issued
—
completed
3.03K
cumulative oil, bbl
604
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Dec 4, 2008

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 9 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Keeran, G., Etal O-2-764KeeranRemora Management, LLC93.03K604Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Remora Management, LLCNov 2011 → Jul 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
303503-99RecompletionTotal Production Services, Inc.Jun 23, 1986Jun 24, 1986—7,750

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-2-764————

Perforations

Perforated and open-hole intervals.

FromToType
5,5915,595Perforated
5,7945,797Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,901——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/46902926, documented in the API reference.