WELL · 42-469-31135 · DISTRICT 2
Billo Unit #1
Victoria County · Weber (3280) field · Vertical
Billo Unit #1 (API 42-469-31135) is a plugged well in Victoria County, plugged April 12, 1989, last operated by Home Petroleum Corporation.
The RRC has issued 3 drilling permits between 1977 and 1986, permitted to 4,100 ft.
It was permitted by Kaiser-Francis Oil Company and has since transferred to Home Petroleum Corporation on the wellbore schedule.
Completion filings report 2 formation tops, including Catahoula, Frio.
Operator of record
Permitted by Kaiser-Francis Oil Company; the EWA schedule now lists a different operator.
Denver, CO · P-5 Y, filed Mar 4, 1992 · 104 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Home Petroleum Corporation |
| Production reports | none |
| Latest permit | Kaiser-Francis Oil CompanyOct 21, 1986 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,100
- total depth, ft
- 3
- permits on file
- Oct 21, 1986
- last permit issued
- Nov 3, 1977
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 3, 1977
- Shut in
- —
- Plugged
- Apr 12, 1989
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 321709-99 | Recompletion | Kaiser-Francis Oil Company | Oct 10, 1986 | Oct 21, 1986 | — | 4,059 |
| 92138-99 | Recompletion | Home Petroleum Corporation | Sep 11, 1980 | Sep 11, 1980 | — | 4,059 |
| 10145-99 | Drill | Bridger Petroleum Corp. | Oct 19, 1977 | Oct 19, 1977 | Oct 23, 1977 | 4,100 |
Formation tops
As filed on W-2/G-1. Subsea from 127 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,788 | 2,794 | Perforated |
| 3,178 | 3,188 | Perforated |
| 3,280 | 3,287 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 409 | 12.25 | 270 S |
| 2 | 3,118 | — | — |
| 2.375 | 3,216 | — | — |
| 4.5 | 4,000 | 7.875 | 689 S |
| 4.5 | 4,045 | 7.875 | 689 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 19, 1986 | Oct 30, 1986 | Yes |
| 00 | Nov 8, 1986 | — | — |
| 00 | Jan 12, 1984 | Aug 25, 1980 | — |
| 00 | Jan 12, 1984 | Apr 10, 1978 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-469-31135 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-469-31135 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46931135, documented in the API reference.