WELL · 42-469-31569 · DISTRICT 2
Dietzel N. L. #1
Victoria County · Colletoville Creek (Vicks. 4100) field · Vertical
Dietzel N. L. #1 (API 42-469-31569) is a plugged well in Victoria County, plugged February 12, 2024, last operated by Killam Oil Company.
The RRC has issued 2 drilling permits between 1980 and 1993, permitted to 4,800 ft.
Completion filings report one formation top, including Catahoula.
Operator of record
Laredo, TX · P-5 Y, filed Feb 4, 1994 · 160 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Killam Oil Company |
| Production reports | Desana Development Corporationthrough Dec 1993 |
| Latest permit | Killam Oil CompanyFeb 17, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,800
- total depth, ft
- 2
- permits on file
- Feb 17, 1993
- last permit issued
- Jun 10, 1980
- completed
- 0
- cumulative oil, bbl
- 6.86K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2024
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 10, 1980
- Shut in
- —
- Plugged
- Feb 12, 2024
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Dietzel, N. L. G-2-144353 | Coletto Creek (3600) | Desana Development Corporation | 1 | 0 | 6.86K | Jan 1993 – Feb 2024 |
| — G-2-88702 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Killam Oil CompanyJan 1993 → Jan 1993
- 2Southwest Investment Fund, Inc.May 1993 → Jul 1993
- 3Desana Development CorporationDec 1993 → Dec 1993
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 400907-99 | Recompletion | Killam Oil Company | Jul 20, 1992 | Feb 17, 1993 | May 13, 1992 | 4,357 |
| 79907-99 | Drill | Killam & Hurd, Ltd. | Apr 14, 1980 | Apr 14, 1980 | — | 4,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-88702 | — | — | — | — |
| — | — G-2-144353 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 108 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Catahoula | 2,445 | -2,337 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,710 | 3,714 | Perforated |
| 4,130 | 4,134 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 425 | 10.75 | 300 S |
| 2.875 | 4,320 | 7.875 | 1,050 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 11, 1993 | Jul 20, 1992 | Yes |
| 00 | Mar 23, 1993 | — | — |
| 00 | Jan 12, 1984 | Jun 27, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-469-31569 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-469-31569 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46931569, documented in the API reference.